St. Rose Stormwater Pumping Station

The City of Windsor has completed a Schedule 'C' Municipal Class Environmental Assessment (EA) for the St. Rose Stormwater Pumping Station. An Environmental Study Report (ESR) has been prepared. The recommended layout from the ESR features the pumping station below grade in the centre of the western portion of the park site with the electrical building and emergency generator at the south-west corner of the site.

Construction of the proposed infrastructure will increase the resiliency to flooding in this area and positively impact the community by protecting property, including municipal infrastructure, local transportation networks, and residential properties.

The project is currently in the design phase and is scheduled to commence construction in 2024.

For information on the Municipal Class Environmental Assessment and Environmental Study Report (ESR), visit the Completed Environmental Assessments page.

Status: Detailed Design
Consultant: Stantec Consulting
Contractor: To Be Determined

For detailed inquiries, please contact:

Patrick E. Robitaille, M.Sc (Eng), P.Eng, PE
Project Administrator
(519) 255-6100 Ext. 6675
Email: probitaille@citywindsor.ca