Construction and Detours

Using the Construction and Detours Database

You can search and sort projects by several convenient methods:

  • Filter according to time, choosing from All, Current, Planned or Complete.
  • Keyword Search by street name, project type or any word that may appear in the entry.
  • By column, you can click the heading of any column to sort by that category in either ascending or descending order.​
  • By page, you can move from page to page (ten entries per page) using the buttons at the bottom.

Expand the listing to learn more by clicking the plus + symbol and close it by clicking the minus - symbol.

Street Name Start Date End Date Estimated Duration Description Contact Contractor Status Keywords Filterable Status Sortable Start Date Sortable End Date
Street Name Start Date End Date Estimated Duration Description Contact Contractor Status Keywords Filterable Status Sortable Start Date Sortable End Date
Adanac Avenue (From Campbell Avenue to McKay Avenue) 10/8/2020 12/15/2020 Thursday, October 08, 2020 to Tuesday, December 15, 2020

​Adanac Avenue from Campbell Avenue to McKay Avenue will be closed for sewer, watermain and pavement reconstruction. Local Traffic Only.

Amandeep Bains, P. Eng. Engineer II (519) 255-6100 x6472 D'Amore Construction (2000) Ltd. Complete road,sewer,watermain Complete All 10/08/2020 00:00:00 12/15/2020 00:00:00
Banwell Road (From McHugh Street to McNorton Street) 10/4/2021 10/29/2021 Monday, October 04, 2021 to Friday, October 29, 2021

​The Banwell Road southbound left thru lane at the McHugh Street/McNorton Street intersection will be closed for approximately one (1) month for the construction of a new left turn lane and median work. Local traffic will be permitted only. From October 4, 2021 to October 29, 2021 - weather permitting.

Paul Mourad, P. Eng. (519) 562-2448 Elmara Construction Co Limited Complete road Complete All 10/04/2021 00:00:00 10/29/2021 00:00:00
Banwell Road (From Palmetto Street to E.C. Row Expressway) 10/12/2021 10/22/2021 Tuesday, October 12, 2021 to Friday, October 22, 2021

​There will be partial lane closures on Banwell Road, Palmetto Street to E.C. Row Expressway for approximately two weeks for relocation of hydro poles in preparation for the next phases of Banwell Road Improvements.

Starting Tuesday, October 12, 2021 to October 22, 2021 between 9:00am and 3:00pm (weather permitting).

Tiffany Pocock, P. Eng. (519) 259-8567 S & C Construction Complete road Complete All 10/12/2021 00:00:00 10/22/2021 00:00:00
Banwell Road Corridor Improvements - Phase 1 (From Tecumseh Road East to Palmetto Street) 5/3/2021 5/30/2021 Monday, May 03, 2021 to Sunday, May 30, 2021

​Traffic will be restricted to one lane in each direction on Banwell Road from Tecumseh Road East to Palmetto Street for approximately 4 weeks for the construction of (surface asphalt, driveway repairs and landscaping).

Tiffany Pocock, P. Eng. (519) 259-8567 SheaRock Construction Group Inc. Complete road Complete All 05/03/2021 00:00:00 05/30/2021 00:00:00
Bernard Road (From Tecumseh Road East to Guy Street) 5/25/2021 10/1/2021 Tuesday, May 25, 2021 to Friday, October 01, 2021

​Bernard Road from Tecumseh Road East to Guy Street will be closed for approximately 5 months for sewer, pavement, watermain and street lighting rehabilitation. Local traffic will be permitted only. The westbound curb lane and eastbound left turn lane on Tecumseh Road East will be closed as needed.

Joe Bressan, Engineering 1,Operations (519) 255-6100 x6890 Sterling Ridge Infrastructure Inc. Complete road,sewer,sidewalk,watermain Complete All 05/25/2021 00:00:00 10/01/2021 00:00:00
Byng Road (From Seymour Boulevard to Lappan Avenue) 6/21/2021 8/27/2021 Monday, June 21, 2021 to Friday, August 27, 2021

As part of an ongoing infrastructure renewal program, the Windsor Utilities Commission (WUC) will be installing a new 200mm dia. PVC watermain on Byng Road from Seymour Boulevard to Lappan Avenue.

Byng Pre-Construction Notification.pdfByng Pre-Construction Notification.pdf

Spencer Johnston, Manager Water Construction & Design (519) 251-7300 x609 Major Construction (2010) Ltd. Complete watermain Complete All 06/21/2021 00:00:00 08/27/2021 00:00:00
Caban/Dougall Intersection Closure (From Cabana Road to Dougall Avenue) 10/22/2021 10/27/2021 Friday, October 22, 2021 to Wednesday, October 27, 2021

​As part of the Cabana Road Corridor Improvements Phase 3, the intersection of Cabana Road and Dougall Avenue will be completely closed to traffic for road reconstruction and traffic signal work. Access for emergency vehicles will be maintained. A noise by-law exemption was approved by City Council to allow for the accelerated completion of the work. Detour signage will be in place. From 8:00pm on Friday, October 22 until 8:00pm Wednesday, October 27, 2021. (weather permitting).

Jane He, P. Eng., Engineering (519) 255-6257 x6358 Amico Infrastructures Inc. / City of Windsor Complete road Complete All 10/22/2021 00:00:00 10/27/2021 00:00:00
Cabana Corridor Improvements Phase 3 (From Dougall Avenue to Northway Avenue) 4/19/2021 12/31/2021 Monday, April 19, 2021 to Friday, December 31, 2021

​Watch for lane restrictions and construction crews along Cabana Road West between Dougall Avenue and Northway Avenue. New infrastructure work is set to get underway, possibly this week, and while some road closures may be needed from time to time, through traffic is expected to be maintained for the most part.

cabana.pdfcabana.pdf

Jane He, P. Eng., Engineering (519) 255-6257 x6358 Amico Infrastructures Current road Current All 04/19/2021 00:00:00 12/31/2021 00:00:00
Cabana Road Improvements Phase 3 Road Closures (From Dominion Boulevard to McKay Avenue) 8/3/2021 9/6/2021 Tuesday, August 03, 2021 to Monday, September 06, 2021

​As part of the Cabana Road Corridor Improvements - Phase 3, Dominion Boulevard and McKay Avenue will be closed between Roselawn Drive and Cabana Road. Local traffic only. From Tuesday, August 3, 2021, until approximately Labour Day.

Jane He, P. Eng., Engineering (519) 255-6257 x6358 Amico Infrastructures Inc. Complete road Complete All 08/03/2021 00:00:00 09/06/2021 00:00:00
Cabana Road Lane Closures (From Howard Avenue to Dougall Avenue) 5/13/2021 5/15/2021 Thursday, May 13, 2021 to Saturday, May 15, 2021

​Cabana Road will be restricted to one lane in each direction between Dougall Avenue and Howard Avenue for surface asphalt paving.

Left turn lanes on Cabana, both eastbound and westbound, will be closed at Howard Avenue and Dougall Avenue during daytime paving operations. Traffic on Howard Avenue and Dougall Avenue will remain unaffected.

Access to Cabana Road will be closed from the side streets including Ouellette Avenue, Huntington and Inglewood during the work.

Please use an altenate route to access the area north of Cabana Road between Howard Avenue and Dougall Avenue. Detour signs will be in place.

Jane He, P. Eng., Engineering (519) 984-2235 SheaRock Construction Group Inc. Complete road Complete All 05/13/2021 00:00:00 05/15/2021 00:00:00
Cabana Road West (From Dougall Avenue to Howard Avenue) 4/26/2021 5/28/2021 Monday, April 26, 2021 to Friday, May 28, 2021

​Cabana Road West will have lane restrictions between Dougall Avenue and Howard Avenue for sewer relining, boulevard restoration and surface asphalt paving work. Detour signage will be in place.

Dougall Avenue north of Cabana Road will have a one-day lane restriction as a result of this work on Monday, April 26, 2021.

Jane He, P. Eng., Engineering (519) 984-2235 SheaRock Construction Group Inc. Complete road,sewer Complete All 04/26/2021 00:00:00 05/28/2021 00:00:00
Cadillac Street (From Tecumseh Road East to Alice Street) 8/10/2020 12/15/2020 Monday, August 10, 2020 to Tuesday, December 15, 2020

​Cadillac Street from Tecumseh Road East to Alice Street is closed for sewer, pavement and street lighting reconstruction. Local traffic only

Travis Frickey Technologist Operations (519) 255-6560 x6305 Sterling Ridge Infrastructure Inc. Complete road,sewer Complete All 08/10/2020 00:00:00 12/15/2020 00:00:00
Cameron Avenue (From Riverside Drive West to Wyandotte Street West) 3/25/2021 7/5/2021 Thursday, March 25, 2021 to Monday, July 05, 2021

​Cameron Avenue from Riverside Drive West to Wyandotte Street West will be closed for approximately 2 months for the reconstruction of watermain and milling and paving of existing roadway. The roadway will be closed (local traffic only) for the duration of the project.

Cameron- Public Works Construction Notice.pdfCameron- Public Works Construction Notice.pdf

Michael Cappucci, P. Eng. Contracts Coordinator (519) 255-61000 x4234 Sterling Ridge Group Inc. Complete watermain,road Complete All 03/25/2021 00:00:00 07/05/2021 00:00:00
Campbell Avenue (From Riverside Drive West to Tecumseh Road West) 6/28/2021 10/22/2021 Monday, June 28, 2021 to Friday, October 22, 2021

​The Windsor Utilities Commission will be reconstructing the watermains on Campbell Avenue from Riverside Drive West to Tecumseh Road West (Ward 2).

Phase 1 - Riverside Drive West to University Avenue West

Phase 2 - University Avenue West to Wyandotte Street West

Phase 3 - Wyandotte Street West to ETR

Phase 4 - College Avenue to Tecumseh Road West

2021-019 Campbell PH1 Pre-Construction Notification.pdf2021-019 Campbell PH1 Pre-Construction Notification.pdf

Spencer Johnston, Manager Water Construction & Design (519) 251-7300 x609 Major Construction (2010) Ltd. Complete watermain Complete All 06/28/2021 00:00:00 10/22/2021 00:00:00
Campbell Avenue (From Riverside Drive West to Tecumseh Road West) 8/24/2021 11/12/2021 Tuesday, August 24, 2021 to Friday, November 12, 2021

​The Windsor Utilities Commission will be reconstructing the watermain on Campbell Avenue between Riverside Drive West and Tecumseh Road West (Ward 2).

Campbell PH3 Pre-Construction Notification.pdfCampbell PH3 Pre-Construction Notification.pdf

Spencer Johnston, Manager Water Construction & Design (519) 251-7300 x609 Major Construction (2010) Ltd. Complete watermain Complete All 08/24/2021 00:00:00 11/12/2021 00:00:00
Campbell Avenue (From Riverside Drive West to Tecumseh Road West) 9/15/2021 12/24/2021 Wednesday, September 15, 2021 to Friday, December 24, 2021

​The Windsor Utilities Commission will be reconstructing the watermain on Campbell Avenue from Riverside Drive West to Tecumseh Road West (Ward 2).

Campbell PH4 Pre-Construction Notification.pdfCampbell PH4 Pre-Construction Notification.pdf

Spencer Johnston, Manager Water Construction & Design (519) 251-7300 x609 Major Construction (2010) Ltd. Current watermain Current All 09/15/2021 00:00:00 12/24/2021 00:00:00
Central Avenue (From Central Avenue to E.C. Row Expressway) 10/18/2021 11/7/2021 Monday, October 18, 2021 to Sunday, November 07, 2021

​Southbound Central Avenue will be reduced to one lane leading to the Central Avenue Overpass, over the E.C. Row Expressway, starting on Monday October 18, 2021. This is the first of 3 phases of bridgework that will impact drivers between October 18 and November 7, 2021. Dates will be released for each stage as they draw nearer, and the work will generally include:

Stage 1 - Southbound Central Avenue reduced to one lane.

Stage 2 - Closure of entire structure for one weekend for asphalt resurfacing and line painting.

Stage 3 - Nightly closure of structure from 7:00pm to 5:00am, reopened for daytime traffic.

Detours will be posted for full closures and construction notices issued as work progresses.

Michael Cappucci, P. Eng. Contracts Coordinator (519) 255-6326 Front Construction Industries Inc. Complete road,bridge Complete All 10/18/2021 00:00:00 11/07/2021 00:00:00
Crawford Avenue, Riverside Drive West, Oak Street (From see description to see description) 3/1/2021 6/1/2021 Monday, March 01, 2021 to Tuesday, June 01, 2021

​The Windsor Utilities Commission will be reconstructing the watermains on:

Crawford Avenue - Wyandotte Street West to Riverside Drive West

Riverside Drive West - Elm Avenue to Crawford Avenue

Oak Street - University Avenue West to Riverside Drive West

WUC Contract 2020-030 Pre-Construction Letter.pdfWUC Contract 2020-030 Pre-Construction Letter.pdf

Spencer Johnston, Manager Water Construction & Design (519) 251-7300 x609 D'Amore Construction Complete watermain Complete All 03/01/2021 00:00:00 06/01/2021 00:00:00
Curry and McKay Avenue (From Grove Avenue to Adanac Avenue) 3/8/2021 6/15/2021 Monday, March 08, 2021 to Tuesday, June 15, 2021

​Curry Avenue and McKay Avenue will be closed between Grove Avenue and Adanac Avenue for sewer, watermain and road rehabilitation. Sidewalk and Boulevard restoration work will be done on Adanac Avenue between Campbell Avenue and Adanac Avenue.

Amandeep Bains, P. Eng. Engineer II (519) 816-4061 D'Amore Construction (2000) Ltd. Complete road,sewer,sidewalk,watermain,bridge Complete All 03/08/2021 00:00:00 06/15/2021 00:00:00
Curry Avenue (From Norfolk Street to Richardie Boulevard) 10/4/2021 11/30/2021 Monday, October 04, 2021 to Tuesday, November 30, 2021

Curry Avenue from Norfolk Street to Richardie Boulevard will be closed for storm sewer, road reconstruction and local improvement.

June Liu-Vajko, Tech III Design and Development Engineering (519) 818-2409 Coco Paving Inc. Complete sewer,road Complete All 10/04/2021 00:00:00 11/30/2021 00:00:00
Dominion Boulevard (From West Grand Boulevard to Norfolk Street) 11/17/2021 11/17/2021 Wednesday, November 17, 2021

​Southbound Dominion Boulevard will have lane restrictions between West Grand Boulevard and Norfolk Street for sidewalk reconstruction. From 7:00am to 6:00pm on Wednesday, November 17, 2021.

Roberta Harrison, Maintenance Coordinator (519) 255-6560 x4241 PieraCon Complete sidewalk Complete All 11/17/2021 00:00:00 11/17/2021 00:00:00
Dougall Avenue (From Tecumseh Road West to Eugenie Street) 11/10/2021 11/12/2021 Wednesday, November 10, 2021 to Friday, November 12, 2021

​Dougall Avenue will be closed for track repairs at the railroad tracks between Tecumseh Road West and Eugenie Street. From 7:00am on Wednesday, November 10, until 5:00pm, Friday, November 12, 2021.

Roberta Harrison, Maintenance Coordinator (519) 255-6560 x4241 CP Rail Complete railroad Complete All 11/10/2021 00:00:00 11/12/2021 00:00:00
Eastlawn Avenue (From Wyandotte Street East to Edgar Street) 9/8/2021 3/31/2022 Wednesday, September 08, 2021 to Thursday, March 31, 2022

Eastlawn Avenue from Wyandotte Street East to Edgar Street will be closed until approximately March of 2022 for sewer, pavement, watermain, sidewalk and streetlighting rehabilitation. Local Traffic only.

Andrew Dowie, P. Eng., (519) 255-6257 x6490 Sterling Ridge Infrastructure Inc. Current road,sewer,sidewalk,watermain Current All 09/08/2021 00:00:00 03/31/2022 00:00:00
E.C. Row Avenue East (From Bliss Road to Turner Road) 9/13/2021 9/30/2021 Monday, September 13, 2021 to Thursday, September 30, 2021

​E.C. Row Avenue East will have intermittent lane closures between Bliss Road and Turner Road for construction of a multi-use trail along the north side of E.C. Row Avenue East. Work will primarily take place off the roadway, but restrictions may be required occasionally, and a flag person will be on site in those situations.

Juan Paramo, Transportation Planning (519) 999-6378 Quinlan Inc, Complete road Complete All 09/13/2021 00:00:00 09/30/2021 00:00:00
E.C. Row Expressway Ramp and Lane Closures (From Lauzon Parkway to Jefferson Boulevard) 3/9/2021 3/9/2021 Tuesday, March 09, 2021 Ramp and Lane closures on E.C. Row Expressway between Jefferson Boulevard and Lauzon Parkway for guardrail repairs will affect traffic flow.

Closure of eastbound on-ramp at Lauzon Parkway, 9 a.m. to 12 p.m.
Closure of eastbound off-ramp at Lauzon Parkway and northbound lane restrictions, 12 p.m. to 2 p.m.
Westbound lane restrictions between Lauzon Parkway and Jefferson Boulevard, 12 p.m. to 3 p.m.
Michael Cappucci, Contracts Coordinator 519-255-6326 Royal Fence Complete None. Complete All 03/09/2021 00:00:00 03/09/2021 00:00:00
Ford Boulevard and South National Street (From Ford Boulevard to South National Street) 11/15/2021 12/17/2021 Monday, November 15, 2021 to Friday, December 17, 2021

​The Windsor Utilities Commission will be resconstructing the watermains on Ford Boulevard from South National Street to Reginald Street and on South National Street from Polonia Park Place to Ford Boulevard.

WUC Contract 2021-027 Pre-Construction Letter Ford.pdfWUC Contract 2021-027 Pre-Construction Letter Ford.pdf

Spencer Johnston, Manager Water Construction & Design (519) 251-7300 x609 D'Amore Construction (2000) Ltd. Current watermain Current All 11/15/2021 00:00:00 12/17/2021 00:00:00
Gladstone Avenue and Ypres Avenue (From Gladstone Avenue to Ypres Avenue) 6/9/2021 11/30/2021 Wednesday, June 09, 2021 to Tuesday, November 30, 2021

​Gladstone Avenue from Tecumseh Road East to Ypres Avenue as well as Ypres Avenue from Forest Avenue to Walker Road will be under road and  watermain construction for approximately 5 months. Gladstone Avenue will be closed and Ypres Avenue will be partially closed (westbound) for the duration of construction to local traffic only. Travellers should expect long delays and avoid area if possible. To complete the project as fast as possible, construction will occur simultaneously between the two streets (when possible).

Michael Cappucci, P. Eng. Contracts Coordinator (519) 255-61000 x4234 Sterling Ridge Group Inc. Complete road,watermain Complete All 06/09/2021 00:00:00 11/30/2021 00:00:00
Howard Avenue (From South Cameron Boulevard to Ducharme Street) 11/9/2021 11/12/2021 Tuesday, November 09, 2021 to Friday, November 12, 2021

​Howard Avenue between South Cameron Boulevard and Ducharme Street will have intermittent lane closures for manhole repairs. From November 9, to November 12, 2021.

Roberta Harrison, Maintenance Coordinator (519) 255-6560 x4241 BXF Infrastructures Inc. Complete sewer Complete All 11/09/2021 00:00:00 11/12/2021 00:00:00
Huron Church Road (From Tecumseh Road West to College Avenue) 4/6/2021 8/15/2021 Tuesday, April 06, 2021 to Sunday, August 15, 2021

​Huron Church Road will have lane(s) closed between Tecumseh Road West and College Avevue for the reconstruction of the road and watermain. Please follow posted detour signs. Expect delays.

Huron Church Road will continue to have lane restrictions between Tecumseh Road West and College Avenue for final electrical, signal and landscaping work to complete the construction project. Ongoing until Monday, September 6, 2021 (weather permitting).

Additional Improvements Announced for Huron Church Road.pdfAdditional Improvements Announced for Huron Church Road.pdf

Michael Cappucci, P. Eng. Contracts Coordinator (519) 255-6100 x4234 Pieracon Complete road,watermain Complete All 04/06/2021 00:00:00 08/15/2021 00:00:00
Huron Church Road (From College Avenue to Wyandotte Street West) 11/8/2021 11/12/2021 Monday, November 08, 2021 to Friday, November 12, 2021

​Huron Church Road will have lane restrictions in both directions between College Avenue and Wyandotte Street West for road patching. From 7:00am to 7:00pm on Monday, November 8 until Friday, November 12, 2021.

Roberta Harrison, Maintenance Coordinator (519) 255-6560 x4241 PieraCon Complete road Complete All 11/08/2021 00:00:00 11/12/2021 00:00:00
Kildare Road (From Wyandotte Street East to Assumption Street) 8/9/2021 9/17/2021 Monday, August 09, 2021 to Friday, September 17, 2021

​The Windsor Utilities Commission will be reconstructing the watermains on: Kildare Road from Wyandotte Street East to Assumption Street (Ward 4).

Kildare Pre-Construction Notification.pdfKildare Pre-Construction Notification.pdf

Spencer Johnston, Manager Water Construction & Design (519) 251-7300 x609 Major Construction (2010) Ltd. Complete watermain Complete All 08/09/2021 00:00:00 09/17/2021 00:00:00
Labelle Street (From Dominion Boulevard to Rockwell Boulevard) 4/26/2021 6/25/2021 Monday, April 26, 2021 to Friday, June 25, 2021

​Labelle Street from Dominion Boulevard to Rockwell Boulevard will be closed for approximately 1 month for road rehabilitation. The road will be closed (local traffic only) for the duration of the project.

Michael Cappucci, P. Eng. Contracts Coordinator (519) 255-61000 x4234 D'Amore Construction (2000) Ltd. Complete road Complete All 04/26/2021 00:00:00 06/25/2021 00:00:00
Lauzon Parkway (From Tecumseh Road East to Hawthorne Drive) 6/7/2021 10/1/2021 Monday, June 07, 2021 to Friday, October 01, 2021

​Lauzon Parkway from Tecumseh Road East to Hawthorne Drive will be partially closed for approximately 4 months for the reconstruction of travel lanes, new sidewalk and multi-use trail. The roadway will be reduced to one lane in the southbound direction and one lane in the northbound direction for the duration of the project. Road users should expect delays. Access to all businesses remain open. From June 7 to October 1, 2021 (weather permitting).

Michael Cappucci, P. Eng. Contracts Coordinator (519) 255-61000 x4234 SheaRock Construction Group Inc. Complete road,sidewalk Complete All 06/07/2021 00:00:00 10/01/2021 00:00:00
Mark Avenue (From Campbell Avenue to Algonquin Street) 9/13/2021 12/22/2021 Monday, September 13, 2021 to Wednesday, December 22, 2021

​Mark Avenue from Campbell Avenue to Algonquin Street will be closed for approximately 4 months for sewer, pavement and watermain rehabilitation. Local traffic will be permitted only. The southbound lane of Campbell at Mark Avenue will be closed as needed.

Joe Bressan, Engineering 1,Operations (519) 255-6100 x6890 D'Amore Construction (2000) Inc. Current road,sewer,watermain Current All 09/13/2021 00:00:00 12/22/2021 00:00:00
McDougall Street (From Tecumseh Road East to Eugenie Street) 11/8/2021 11/9/2021 Monday, November 08, 2021 to Tuesday, November 09, 2021

​McDougall Street will be closed for track repairs at the railroad tracks between Tecumseh Road East and Eugenie Street. From 7:00am, Monday, November 8, until 5:00pm Tuesday, November 9, 2021.

Roberta Harrison, Maintenance Coordinator (519) 255-6560 x4241 CP Rail Complete railroad Complete All 11/08/2021 00:00:00 11/09/2021 00:00:00
North Talbot Road (From Howard Avenue to Southwood Lakes Boulevard) 11/29/2021 12/3/2021 Monday, November 29, 2021 to Friday, December 03, 2021

​Installation of water services on North Talbot Road from Howard Avenue to east of Southwood Lakes Boulevard. Expect some delays.

Paul Mourad, P. Eng. (519) 562-2448 SheaRock Construction Group Inc. Complete watermain Complete All 11/29/2021 00:00:00 12/03/2021 00:00:00
Ojibway Parkway (From Sprucewood Avenue to GN Booth Drive) 3/29/2021 9/30/2021 Monday, March 29, 2021 to Thursday, September 30, 2021

​Southbound Ojibway Parkway will have partial lane restrictions intermittently between Sprucewood Avenue and GN Booth Drive for rehabilitation of the sanitary trunk sewer. Work will primarily take place on the shoulder of the roadway, but restrictions may occasionally be required.

Roberta Harrison, Maintenance Coordinator (519) 255-6560 x4241 Clean Water Works Inc. Complete sewer Complete All 03/29/2021 00:00:00 09/30/2021 00:00:00
Olive Road (From Milloy Street to Tecumseh Road East) 5/17/2021 10/30/2021 Monday, May 17, 2021 to Saturday, October 30, 2021

​Olive Road from Milloy Street to Tecumseh Road East will be closed for approximately four months for the rehabilitation of sanitary and storm sewers, pavement, watermain and street lighting. Local traffic will be permitted only.

Tiffany Pocock, P. Eng. (519) 259-8567 D'Amore Construction (2000) Ltd. Complete road,sewer,sidewalk,watermain Complete All 05/17/2021 00:00:00 10/30/2021 00:00:00
Parent Avenue (From Erie Street East to Giles Boulevard West) 3/8/2021 4/30/2021 Monday, March 08, 2021 to Friday, April 30, 2021

​The Windsor Utilities Commission will be reconstructing the watermains on Parent Avenue from Erie Street East to Giles Boulevard West (Ward 4).

WUC Contract 2020-032 Parent - Giles to Erie.pdfWUC Contract 2020-032 Parent - Giles to Erie.pdf

Spencer Johnston, Manager Water Construction & Design (519) 251-7300 x609 Coco Paving Complete watermain Complete All 03/08/2021 00:00:00 04/30/2021 00:00:00
Parent Avenue and Hanna Street East (From see description to see description) 10/13/2020 12/18/2020 Tuesday, October 13, 2020 to Friday, December 18, 2020

​The Windsor Utilities Commission will be reconstructing the watermains on:

Parent Avenue - Giles Boulevard to Tecumseh Road East (Ward 4)

Hanna Street East - Elsmere Avenue to Langlois Avenue

WUC Contract 2020-032 Parent - Tecumseh to Giles.pdfWUC Contract 2020-032 Parent - Tecumseh to Giles.pdf

Spencer Johnston, Manager Water Construction & Design (519) 251-7300 x609 Coco Paving Complete watermain Complete All 10/13/2020 00:00:00 12/18/2020 00:00:00
Parkside Court (From Beals Street West to 1548 Parkside Court) 11/16/2020 12/7/2020 Monday, November 16, 2020 to Monday, December 07, 2020

​Parkside Court will be closed from Beals Street West to 1548 Parkside Court for Watermain Reconstruction.

Spencer Johnston, WUC 519-251-7300 x 609 To be determined. Complete watermain Complete All 11/16/2020 00:00:00 12/07/2020 00:00:00
Provincial/Division Corridor Improvements Phase 2 (From Lowe's / Monarch Basics to Legacy Park Drive) 10/20/2020 11/26/2021 Tuesday, October 20, 2020 to Friday, November 26, 2021

​Provincial Road from Lowe's / Monach Basics intersection to Legacy Park Drive is fully OPEN by December 18, 2020.  Construction continues on 6th CONCESSION DRAIN and NORTH ROSELAND PUMP STATION in CAPTAIN JOHN WILSON PARK.

Jane He, P. Eng., Engineering (519) 255-6257 x6358 J&J Lepera Infrastructure Complete watermain Complete All 10/20/2020 00:00:00 11/26/2021 00:00:00
Randolph Avenue (From Cleary Street to Northwood Street) 9/13/2021 12/17/2021 Monday, September 13, 2021 to Friday, December 17, 2021

​Randolph Avenue from Cleary Street to Northwood Street will be closed for storm sewer, pavement, watermain streetlighting rehabilitation and local improvement work. Local traffic only.

Sarah Meneses, P. Eng. (519) 255-6100 x6336 J.C.S. Construction Inc. Current road,sewer,watermain Current All 09/13/2021 00:00:00 12/17/2021 00:00:00
Rankin Avenue (From Union Street to Wyandotte Street West) 9/27/2021 12/10/2021 Monday, September 27, 2021 to Friday, December 10, 2021

​Rankin Avenue from Union Street to Wyandotte Street West will be closed for approximately 2 months for sewer, pavement and street lighting rehabilitation. Local traffic will be permitted only.

Michael Todd, P. Eng. (519) 255-6100 x6407 D'Amore Construction (2000) Ltd. Current road,sewer Current All 09/27/2021 00:00:00 12/10/2021 00:00:00
Riverside Drive East (From Little River Drain to East of Riverdale) 7/5/2021 10/15/2021 Monday, July 05, 2021 to Friday, October 15, 2021

​Riverside Drive East will be closed for structure rehabilitation work on the bridge over Little River Drain (east of Riverdale). 

Zoran Savic (519) 255-6326 ext. 4231 zsavic@citywindsor.ca Front Construction Ltd. Complete bridge Complete All 07/05/2021 00:00:00 10/15/2021 00:00:00
Riverside Drive East (From Strabane Avenue to Greenpark Boulevard) 10/28/2021 11/5/2021 Thursday, October 28, 2021 to Friday, November 05, 2021

​Riverside Drive East will have intermittent lane restrictions in both directions between Strabane Avenue and Greenpark Boulevard for manhole repairs.

Roberta Harrison, Maintenance Coordinator (519) 255-6560 x4241 BXF Infrastructures Inc. Complete road,sewer Complete All 10/28/2021 00:00:00 11/05/2021 00:00:00
Riverside Drive East at Strabane Avenue (From Pratt Place to George Avenue) 10/20/2020 12/15/2020 Tuesday, October 20, 2020 to Tuesday, December 15, 2020

​Riverside Drive East will be reduced to one lane in each direction between Pratt Place and George Avenue for sewer and road construction, and Strabane Avenue will be closed (only local traffic allowed) from Riverside Drive East to Wyandotte Street East.

Wyandotte Street East and Strabane Avenue Intersection is now OPEN to through traffic.

June Liu-Vajko, Tech III Design and Development Engineering (519) 255-6257 x6339 Sherway Contracting (Windsor) Limited Complete road,sewer Complete All 10/20/2020 00:00:00 12/15/2020 00:00:00
Strabane Avenue (From Riverside Drive East to Wyandotte Street East) 5/10/2021 7/31/2021 Monday, May 10, 2021 to Saturday, July 31, 2021

​Replacement of combined sewers and road rehabilitation on Strabane Avenue from Riverside Drive East to Wyandotte Street East. Road rehablitation on Erskine Street from Strabane Avenue westerly.

June Liu-Vajko, Tech III Design and Development Engineering (519) 818-2409 Sherway Contracting (Windsor) Limited Complete road,sewer Complete All 05/10/2021 00:00:00 07/31/2021 00:00:00
Tecumseh Road East (From Forest Glade Drive to Clover Avenue) 3/10/2021 8:00 AM 3/11/2021 5:00 PM Wednesday, March 10, 2021 8:00 AM to Thursday, March 11, 2021 5:00 PM

​Tecumseh Road East currently has eastbound lane restrictions between Forest Glade and Clover Avenue for catch basin repairs.

Roberta Harrison, Maintinance Corrdinator, (519) 266-65660 x4241 DanRuss Complete sewer Complete All 03/10/2021 08:00:00 03/11/2021 17:00:00
Tecumseh Road East (From Walker Road to Drouillard Road) 7/8/2021 9/8/2021 Thursday, July 08, 2021 to Wednesday, September 08, 2021

​Westbound Tecumseh Road from Drouillard Road to Walker Road will be single lane traffic for 2 months for the road and watermain rehabilitation. Travellers should expect long delays.

Michael Cappucci, P. Eng. Contracts Coordinator (519) 255-61000 x4234 Sherway Contracting (Windsor) Limited Complete watermain,road Complete All 07/08/2021 00:00:00 09/08/2021 00:00:00
Tecumseh Road East (From Walker Road to Drouillard Road) 10/5/2021 10/18/2021 Tuesday, October 05, 2021 to Monday, October 18, 2021 Eastbound Tecumseh Road East will have lane restrictions between Walker Road and Drouillard Road for road reconstruction. Left turns will not be permitted through the construction zone. Roberta Harrison, Maintenance Coordinator (519) 255-6560 x4241 Sherway Contracting (Windsor) Limited Complete road Complete All 10/05/2021 00:00:00 10/18/2021 00:00:00
Tecumseh Road East (From Aubin Road to Rossini Boulevard) 10/21/2021 10/25/2021 Thursday, October 21, 2021 to Monday, October 25, 2021

​Westbound Tecumseh Road East has lane restrictions between Aubin Road and Rossini Boulevard for road repairs. Please slow down and use caution in the construction zone. From 8:00am to 7:00pm ongoing until Monday, October 25, 2021.

Roberta Harrison, Maintenance Coordinator (519) 255-6560 x4241 Diponti Paving Complete road Complete All 10/21/2021 00:00:00 10/25/2021 00:00:00
Tecumseh Road East (From Walker Road to Drouillard Road) 10/28/2021 11/5/2021 Thursday, October 28, 2021 to Friday, November 05, 2021

​Eastbound Tecumseh Road East will have lane restrictions for road repairs between Walker Road and Drouillard Road. Access to Tecumseh Road from Drouillard Road will remain open with restrictions. Chrysler Way will be closed at Tecumseh Road for the duration.

Roberta Harrison, Maintenance Coordinator (519) 255-6560 x4241 Sherway Construction Complete road Complete All 10/28/2021 00:00:00 11/05/2021 00:00:00
University Avenue East (From Ouellette Avenue to Goyeau Avenue) 6/21/2021 7/2/2021 Monday, June 21, 2021 to Friday, July 02, 2021

​Westbound University Avenue East will be closed between Ouellette Avenue and Goyeau Street for sidewalk repairs. Access to businesses will remain open. From 7:30am to 6:00pm on Monday June 21 to Friday Jly 2, 2021.

Roberta Harrison, Maintenance Coordinator (519) 255-6560 x4241 Giorgi Construction Complete sidewalk Complete All 06/21/2021 00:00:00 07/02/2021 00:00:00
Westminster Boulevard (From Wyandotte Street East to CNR rail tracks) 10/18/2021 12/10/2021 Monday, October 18, 2021 to Friday, December 10, 2021

​As part of an ongoing infrastructure renewal program, the Windsor Utilities Commission (WUC) will be installing a new 200mm PVC watermain on Westminster Boulevard from Wyandotte Street East to CNR rail tracks by horizontal directional drilling method. Work is scheduled to begin the week of October 18, 2021. The project should take approximately 8 weeks to complete. Project timing is weather dependant. Tree trimming will also occur in advance by a certified sub-contractor.

Spencer Johnston, Manager Water Construction & Design (519) 251-7300 x609 D'Amore Construction (2000) Ltd. Current watermain Current All 10/18/2021 00:00:00 12/10/2021 00:00:00
Wildwood Drive (From Halpin Road to Robinet Road) 9/16/2021 9/23/2021 Thursday, September 16, 2021 to Thursday, September 23, 2021

​Wildwood Drive will have lane restrictions between Halpin Road and Robinet Road for sidewalk construction.

Roberta Harrison, Maintenance Coordinator (519) 255-6560 x4241 PieraCon Complete sidewalk Complete All 09/16/2021 00:00:00 09/23/2021 00:00:00
Wyandotte Street East (From Lauzon Road to St. Rose Avenue) 10/21/2021 10/26/2021 Thursday, October 21, 2021 to Tuesday, October 26, 2021

​Westbound Wyandotte Street East has lane restrictions between Lauzon Road and St. Rose Avenue for road repairs. Please slow down and use caution in the construction zone. From 8:00am to 6:00pm ongoing until Tuesday, October 26, 2021.

Roberta Harrison, Maintenance Coordinator (519) 255-6560 x4241 Villa Construction Complete road Complete All 10/21/2021 00:00:00 10/26/2021 00:00:00
Ypres Avenue (From Forest Avenue to Walker Road) 10/18/2021 11/26/2021 Monday, October 18, 2021 to Friday, November 26, 2021

​Eastbound Ypres Avenue will be closed between Forest Avenue and Walker Road for road construction. From Monday, October 18 to Friday, November 26, 2021.

Roberta Harrison, Maintenance Coordinator (519) 255-6560 x4241 Sterling Ridge Infrastructure Complete road Complete All 10/18/2021 00:00:00 11/26/2021 00:00:00

Projects Under Construction

For information on projects currently under construction, click here to launch the Construction and Detours mapping application

Projects Scheduled for Construction

For information on sewers, road widening, street lighting, City-owned facilities, and new subdivisions scheduled for construction in the near future, use the database above. For descriptions of some maintenance activities, please consult the following pages:

Building Windsor's Future

The City of Windsor will undergo a physical transformation over the coming years due to a significant investment in capital projects. For a detailed list of current projects please visit the Building Windsor's Future page. 

Engineering Requirements for Development in the Public Right-of-Way

For information on the City's engineering standards for construction works within the public right of way, please consult the Public Infrastructure & Right-of-Way Requirements page.

Engineering Department
350 City Hall Square West, 3rd Floor
P. O. Box 1607
Windsor, Ontario
Canada
N9A 6S1

Phone: For general information, call 311. For detailed inquires, call 519-255-6257.
Fax: 519-255-9847
Email: engineeringdept@citywindsor.ca

​​​​ ​​​​​​​