Construction Projects
Skip to main content Skip to navigation Skip to footer

Construction

Using the Construction and Detours Database

You can search and sort projects by several convenient methods:

  • Filter according to time, choosing from All, Current, Planned or Complete.
  • Keyword Search by street name, project type or any word that may appear in the entry.
  • By column, you can click the heading of any column to sort by that category in either ascending or descending order.​
  • By page, you can move from page to page (ten entries per page) using the buttons at the bottom.

Expand the listing to learn more by clicking the plus + symbol and close it by clicking the minus - symbol.

Street Name Start Date End Date Estimated Duration Description Contact Contractor Status Keywords Filterable Status Sortable Start Date Sortable End Date
Street Name Start Date End Date Estimated Duration Description Contact Contractor Status Keywords Filterable Status Sortable Start Date Sortable End Date
Alten Drive (From Regis Avenue to Ashland Drive) 9/18/2018 9/20/2018 Tuesday, September 18, 2018 to Thursday, September 20, 2018

​Alten Drive from Regis Avenue to Ashland Drive will be closed for resurfacing.

Letter to Residents - Alten.pdfLetter to Residents - Alten.pdf

Wade Bondy, Public Works 519-255-6560 Ext 4234 Coco Paving Inc. Complete road Complete All 09/18/2018 00:00:00 09/20/2018 00:00:00
Arthur Road (From Seminole Street to CNR tracks) Pending. Pending. Planned

Arthur Road from Seminole Street to the CNR tracks wil be closed for paving.

Work to be completed in the Spring of 2019.

PRECISE DATE FOR WORK TO BE DETERMINED

Wade bondy, Public Works 519-255-6560 Ext. 4234 Mill-Am Corporation Planned road Planned All 01/01/0001 00:00:00 01/01/0001 00:00:00
Ashland Drive (From Regis Avenue to Beachdale Road) 9/17/2018 9/18/2018 Monday, September 17, 2018 to Tuesday, September 18, 2018

Ashland Drive from Regis Avenue to Beachdale Road will be closed for resurfacing.

Letter to Residents - Ashland.pdfLetter to Residents - Ashland.pdf

Wade Bondy, Public Works 519-255-6560 Ext 4234 Coco Paving Inc. Complete road Complete All 09/17/2018 00:00:00 09/18/2018 00:00:00
Beachdale Road (From Esplanade Drive to Wildwood Drive) 10/11/2018 10/19/2018 Thursday, October 11, 2018 to Friday, October 19, 2018

Beachdale Road from Esplanade Drive to Wildwood Drive will be closed for resurfacing.

Work compeltion extended due to ground conditions requiring more extensive repairs.

 

Wade Bondy, Public Works 519-255-6560 Ext 4234 Coco Paving Inc. Current road Current All 10/11/2018 00:00:00 10/19/2018 00:00:00
Bernard Road (Bernard Road) 10/23/2017 11/30/2017 Monday, October 23, 2017 to Thursday, November 30, 2017

​The City of Windsor - Office of the City Engineer - Engineering Department will be undertaking a project to construct Storm Sewers on the Bernard Road right of way. Tentatively scheduled to start the week of October 23, 2017.

135-17 BERNARD POND DECOM - Resident notice letter.pdf135-17 BERNARD POND DECOM - Resident notice letter.pdf

Michael Cappucci, P. Eng. (519) 255-6257 x6355 D'Amore Construction (2000) Ltd. Complete sewer Complete All 10/23/2017 00:00:00 11/30/2017 00:00:00
Briarbank Drive (From Mulberry Road to Rosebriar Road) Pending. Pending. Planned

Briarbank Drive from Mulberry Road to Rosebriar Road will be closed for resurfacing.

Work will be completed in September / October of 2018​.

PRECISE DATE FOR WORK TO BE DETERMINED

Wade Bondy, Public Works 519-255-6560 Ext 4234 Coco Paving Inc. Planned road Planned All 01/01/0001 00:00:00 01/01/0001 00:00:00
Broadway Street (From Linsell Avenue to Sandwich Street ) 11/9/2015 12/30/2017 Monday, November 09, 2015 to Saturday, December 30, 2017
Broadway Street will be closed between
Linsell Avenue and Sandwich Street.

This closure is for construction of the Windsor-Detroit Bridge Authority Early Works Contract.
Joe Dattilo, P.Eng.; 519-255-6100 x1734 Amico Infrastructures Inc. Complete road,bridge Complete All 11/09/2015 00:00:00 12/30/2017 00:00:00
Brock Street, Girardot Street, Felix Avenue (From Brock Street, Girardot Street, Felix Avenue to Baby Street, Mulford Court, Prince Road, Brock Street, Linwood Place, Gray Street) 3/5/2018 6/8/2018 Monday, March 05, 2018 to Friday, June 08, 2018

​The Windsor Utilities Commission will be reconstructing the watermains on Brock Street from Baby Street to Mulford Court, Girardot Street from Prince Road to Brock Street and Felix Avenue from Linwwod Place to Gray Street.

WUC 2018-002 Pre-Construction Notification Brock Girardot.pdfWUC 2018-002 Pre-Construction Notification Brock Girardot.pdf

Spencer Johnston, B.Sc., C.E.T. (519) 251-7300 x609 D'Amore Construction Complete watermain Complete All 03/05/2018 00:00:00 06/08/2018 00:00:00
Buckingham Drive (From Rose Avenue to Iris Place) 7/9/2018 11/30/2018 Monday, July 09, 2018 to Friday, November 30, 2018

​Starting the week of July 9, 2018, in conjunction with the Windsor Utilities Commission, the City of Windsor - Office of the City Engineer - Engineering Department, will be undertaking a project to construct new sanitary and storm sewers and watermain on Buckingham Drive from Rose Avenue to Iris Place, road rehabilitation on Iris Place from Buckingham Drive to Westminster Boulevard. The sewer and watermain construction are anticipated to be completed in late 2018, if weather permits.

BUCKINGHAM 78-18 - NOTICE TO RESIDENTS.pdfBUCKINGHAM 78-18 - NOTICE TO RESIDENTS.pdf

June Liu-Vajko, Technologist III (519) 255-6257 x6339 or Norbert Poggio, P. Eng., Director of Water Engineering and Distribution at (519) 251-7300 x295 Major Construction (2010) Ltd. Current road,sewer,watermain Current All 07/09/2018 00:00:00 11/30/2018 00:00:00
Cabana Road (From Howard Avenue to Dougall Avenue) 5/14/2018 11/30/2018 Monday, May 14, 2018 to Friday, November 30, 2018

​Cabana Road east and west bound lanes from Howard Avenue to Dougall Avenue will occasionally have lane restrictions for various utility relocation work.

Jane He, P. Eng. (519) 255-6100 x6358 N/A Current None. Current All 05/14/2018 00:00:00 11/30/2018 00:00:00
Cabana Road East Corridor Improvements Phase 2 (From Howard Avenue to Dougall Avenue) 3/23/2018 11/25/2018 Friday, March 23, 2018 to Sunday, November 25, 2018

​As part of the Cabana Road Corridor Improvements Phase 2, Union Gas will start the installation work of gas main relocation and service line replacement on Cabana Road East between Howard Avenue and Dougall Avenue.  Please watch for periodic isolated lane closures, both East and West bound between Howard Avenue and Dougall Avenue.  All access will be maintained.

Will Ceccacci, construction Project Manager, Union Gas, 519-251-6610 Union Gas Current road Current All 03/23/2018 00:00:00 11/25/2018 00:00:00
Cabana Road East Lane Restrictions (From Holburn Avenue to Howard Avenue) 8/15/2018 8/22/2018 Wednesday, August 15, 2018 to Wednesday, August 22, 2018

​Cabana Road East from Holburn Street to Howard Avenue will be reduced to one lane in each direction for paving work. Also, there will be a closure of the eastbound lanes from 7:00am to 9:00am on the morning of Monday, August 20th. Windsor Police will be on site ensuring traffic flows smoothly. Ongoing to Wednesday, August 22nd, 2018.

Michael Cappucci, P. Eng., (519) 255-6257 x6355 Mill-Am Corp. Complete road Complete All 08/15/2018 00:00:00 08/22/2018 00:00:00
City Hall Square East (From University Avenue East to City Hall Square South) 6/28/2016 5/22/2018 Tuesday, June 28, 2016 to Tuesday, May 22, 2018

​As part of the construction of the New City Hall building, the City Hall Square East roadway will be closed permanently as of June 28.  Vehicular access will no longer be available from the south. However, access to the north parking lot from University Avenue East will not be affected. 

Pedestrian access to both 400 City Hall Square East and 350 City Hall Square West will be available. But, please note, construction zones will be fenced off, and entrance to those construction areas is not allowed. 
 
 
Wadah Al-Yassiri Project Administrator (519) 255-6100 x6494 Oscar Construction Company Limited Complete road Complete All 06/28/2016 00:00:00 05/22/2018 00:00:00
City Hall Square South (From McDougall Avenue to City Hall Square South) 9/24/2018 10/12/2018 Monday, September 24, 2018 to Friday, October 12, 2018

​City Hall Square South, as well as the intersection of McDougall Avenue and City Hall Square South will have lane restrictions for road and sidewalk repairs.

Roberta Harrison, Maintenance Coordinator (519) 255-6560 x4241 Pierascenzi Complete road,sidewalk Complete All 09/24/2018 00:00:00 10/12/2018 00:00:00
Connaught Avenue (From Prince Road to Felix Avenue) 4/9/2018 8/3/2018 Monday, April 09, 2018 to Friday, August 03, 2018

​Connaught Avenue will be closed from Prince Road to Felix Avenue for Sewer, Watermain and Road Construction. Please follow posted signs. Local traffic only.

Construction Notification to residents- 180-17.pdfConstruction Notification to residents- 180-17.pdf

Adam Mourad, P. Eng. (519) 255-6257 x6614 Sherway Contracting (Windsor) Limited Complete road,sewer,watermain,sidewalk Complete All 04/09/2018 00:00:00 08/03/2018 00:00:00
Curry Avenue (From Northwood Avenue to Labelle Avenue) 10/1/2018 11/1/2018 Monday, October 01, 2018 to Thursday, November 01, 2018

​Curry Avenue from Northwood Street south to E.C. Row Avenue and from Labelle Street north to E.C. Row Avenue will be closed for watermain work. Local access for residents only.

Spencer Johnston, Supervisor, Water Construction and Design (519) 251-7300 x609 To be determined. Current watermain Current All 10/01/2018 00:00:00 11/01/2018 00:00:00
Devon Drive (From Sydney Avenue to E. C. Row Avenue) 6/4/2018 9/1/2018 Monday, June 04, 2018 to Saturday, September 01, 2018

​The Windsor Utilities Commission will be reconstructing the watermains on Devon Drive from Sydney Avenue to E. C. Row Avenue (Ward 9).

Spencer Johnston, B.Sc., C.E.T. (519) 251-7300 x609 SheaRock Construction Complete watermain Complete All 06/04/2018 00:00:00 09/01/2018 00:00:00
Dolphin court (From Palms Crescent to Cul-de-sac) Pending. Pending. Planned

Dolphin Court from Palms Crescent to the cul-de-sac will be closed for resurfacing.

Work to be completed in September / October of 2018

PRECISE DATE OF WORK TO BE DETERMINED

Wade Bondy, Public Works 519-255-6560 Ext 4234 Coco Paving Inc. Planned road Planned All 01/01/0001 00:00:00 01/01/0001 00:00:00
Drouillard Road, Seminole Street (Details pending) 6/18/2018 9/14/2018 Monday, June 18, 2018 to Friday, September 14, 2018

​The Windsor Utilities Commission will be reconstructing the watermains on:

Drouillard Road from Seminole Street to Tecumseh Road East (Ward 5)

Seminole Street from Hickory Road to Drouillard Road (Ward 5)

WUC 2018-011 Construction Notification Drouillard.pdfWUC 2018-011 Construction Notification Drouillard.pdf

Public Notice WUC-ENWIN - Drouillard Watermain Project.pdfPublic Notice WUC-ENWIN - Drouillard Watermain Project.pdf

Matt Lockett Water Systems Designer (519) 251-7300 x639 D'Amore Construction (2000) Ltd. Complete watermain Complete All 06/18/2018 00:00:00 09/14/2018 00:00:00
E.C. Row Expressway (From Banwell Road to Huron Church Road) 6/26/2017 2/28/2018 Monday, June 26, 2017 to Wednesday, February 28, 2018

​Periodic lane closures will be in place in both eastbound and westbound lanes of the E. C. Row Expressway between Banwell Road and Huron Church Road for storm sewer and culvert relining rehabilitation.

Andrew Lewis (519) 255-6560 x4241 Edgewater Sewer Services Complete sewer Complete All 06/26/2017 00:00:00 02/28/2018 00:00:00
E.C. Row Expressway (From Central Avenue to Walker Road) 5/14/2018 7/13/2018 Monday, May 14, 2018 to Friday, July 13, 2018

​The E.C. Row Expressway westbound Collector Road will be closed to all traffic between Central Avenue and Walker Road as part of the rehabilitation of the bridge over CN Rail. A detour for northbound and southbound Walker Road access will be posted. The E.C. Row westbound on ramp at Central will remain open.

Zoran Savic Contracts Supervisor (519) 255-6560 x4231 Amico Infrastructures Inc. Complete bridge Complete All 05/14/2018 00:00:00 07/13/2018 00:00:00
E.C. Row Expressway (From Walker Road to Huron Church) 8/19/2018 8/24/2018 Sunday, August 19, 2018 to Friday, August 24, 2018

​E.C. Row Expressway between Walker Road and Huron Church (including ramps) have intermittent lane restrictions for spray patching. Motorists are asked to be aware of workers on site and use caution when driving in that location. From 7:00pm to 7:00am, Sunday, August 19 to Friday, August 24, 2018.

Roberta Harrison, Maintenance Coordinator (519) 255-6560 x4241 Alite Inc. Complete road Complete All 08/19/2018 00:00:00 08/24/2018 00:00:00
E.C. Row Expressway (From Dominion Boulevard to Jefferson Avenue) 9/18/2018 9/21/2018 Tuesday, September 18, 2018 to Friday, September 21, 2018

​City of Windsor Parks staff will be cutting grass along the centre median of the E.C. Row Expressway this week. The work will be taking place between Dominion Boulevard and Walker Road from 8:00am to 2:00pm each day. Grass will also be cut along the on-and-off ramps between Howard Avenue and Jefferson Avenue on both the east and west sides. Motorists are asked to use extra caution and slow down when seeing workers near the roadways.

Denise Kalas, Parks Supervisor (519) 253-2300 x2737 City of Windsor, Parks Department Complete road Complete All 09/18/2018 00:00:00 09/21/2018 00:00:00
Ellis Street (From Marentette Avenue to Elsmere Avenue) Pending. Pending. Planned

Ellis Street from Marentette Avenue to Elsmere Avenue will be closed for paving.​

Work to be completed in the Spring of 2019.

PRECISE DATE FOR WORK TO BE DETERMINED

Wade Bondy, Public Works 519-255-6560 Ext 4234 Mill-Am Corporation Planned road Planned All 01/01/0001 00:00:00 01/01/0001 00:00:00
Eugenie St (From Eugenie St. to McDougall St.) 9/24/2018 9/28/2018 Monday, September 24, 2018 to Friday, September 28, 2018

Eugenie St and McDougall intersection will be closed in all directions for watermain reconstruction.​

Please be advised that the 5 day full road closure on Eugenie between Ouellette and Howard, including the full closure of the McDougall intersection, will be effective the following dates:

Monday September 24th 2018 at 6:00AM through to Friday September 28th at 6:00PM.

Wade Bondy: 519-255-6560 ext 4234 Coco Paving Inc. Complete watermain,road Complete All 09/24/2018 00:00:00 09/28/2018 00:00:00
Eugenie Street East (From Ouellette Avenue to Howard Avenue) 9/24/2018 10/31/2018 Monday, September 24, 2018 to Wednesday, October 31, 2018

Eugenie Street from Oullette Avenue to Howard Avenue will be reduced to one lane in each direction for watermain construction and road resurfacing.

City Contract 45-18 Pre-Construction Notification -Eugenie.pdfCity Contract 45-18 Pre-Construction Notification -Eugenie.pdf

Wade Bondy, Public Works 519-255-6560 Ext 4234 Coco Paving Current watermain,road Current All 09/24/2018 00:00:00 10/31/2018 00:00:00
Everts Avenue (From Norfolk Street to Cul-de-sac) Pending. Pending. Planned

Everts Avenue from Norfolk Street to the cul-de-sac will be closed for paving.

Work to be completed in the Fall of 2018.

PRECISE DATE FOR WORK TO BE DETERMINED​

Wade Bondy, Public Works 519-255-6560 Ext 4234 Mill-Am Corporation Planned road Planned All 01/01/0001 00:00:00 01/01/0001 00:00:00
Francois Road (From Seminole Street to CN Rail) 8/7/2018 12/15/2018 Tuesday, August 07, 2018 to Saturday, December 15, 2018

​Francois Road between Seminole Street and C.N. Rail, and Franklin Street from Rossini Boulevard to Francois Road will be under construction for sewer, watermain, streetlighting and road rehabilitation. Detour signage will be in place.

Encroachment Letter - Francois Road.pdfEncroachment Letter - Francois Road.pdf 

Janelle Coombs - Public Works - Engineering Department (519) 255-6100 x6407 SLR Contracting Group Inc. Current road,sewer,watermain Current All 08/07/2018 00:00:00 12/15/2018 00:00:00
George Avenue (From Wyandotte Street East to Ontario Street) 2/26/2018 4/27/2018 Monday, February 26, 2018 to Friday, April 27, 2018

​George Avenue will be closed to traffic for the construction of a new 1800mm and 1500mm steel water transmission pipe crossing George Avenue between Wyandotte Street East and Ontario Street. The pipe installation is expected to take approximately five (5) weeks to complete. Project will begin on Monday, February 26, 2018, weather permitting.

Media Release - George Ave Closure 2018.pdfMedia Release - George Ave Closure 2018.pdf

Mike Spagnuolo Traffic Technician (519) 255-6247 x6727 or Barbara Peirce Marshall Enwin Utilities (519) 255-2888 x849 Kenaiden Construction Complete watermain Complete All 02/26/2018 00:00:00 04/27/2018 00:00:00
Gladstone Avenue (From Wyandotte Street East to Riverside Drive East) 9/4/2018 12/7/2018 Tuesday, September 04, 2018 to Friday, December 07, 2018

​Gladstone Avenue between Wyandotte Street East and Riverside Drive East will be closed for sewer and pavement reconstruction.

Michael Cappucci, P. Eng., (519) 255-6257 x6355 D'Amore Contracting Ltd. 2000 Current road,sewer Current All 09/04/2018 00:00:00 12/07/2018 00:00:00
Gladstone Avenue (From Ypres Avenue to Memorial Drive) 11/5/2018 6/14/2019 Monday, November 05, 2018 to Friday, June 14, 2019

Gladstone Avenue from Ypres Avenue to Memorial Drive will be closed for watermain and road reconstruction.​   Watermain work will be completed in November.   Road work will be completed in the spring.

Wade Bondy, Public Works 519-255-6560 Ext 4234 D'Amore Construction Planned watermain,road Planned All 11/05/2018 00:00:00 06/14/2019 00:00:00
Gladstone Avenue at Wyandotte Street East Intersection (From Gladstone Avenue to Wyandotte Street East) 9/4/2018 9/4/2018 Tuesday, September 04, 2018

​The intersection of Gladstone Avenue and Wyandotte Street East will be closed for sewer construction.

Michael Cappucci, P. Eng., (519) 255-6257 x6355 D'Amore Contracting Ltd. 2000 Complete sewer Complete All 09/04/2018 00:00:00 09/04/2018 00:00:00
Gordie Howe International Bridge Project (Details pending) 12/18/2017 12/18/2018 Monday, December 18, 2017 to Tuesday, December 18, 2018

As the preparatory activities progress on the Gordie Howe International Bridge project, and the completion of the first phase of the  perimeter access road (PAR), the WDBA has introduced a new detour route (Monday December 18, 2017) for access to some businesses. The PAR remains closed to non-local traffic. Duration of Detour is unknown at this time, however if required, a one year place holder may be used at this time. 

A map illustrating the new access route is attached for your reference.  

This four kilometre road will circle the Canadian Port of Entry (POE) and provide access into the POE for employees, visitors and suppliers. It will also replace existing roadways that local businesses use to access facilities. Once construction of the Gordie Howe International Bridge project is complete, the City of Windsor will assume ownership of the PAR and will be responsible for maintaining the road as a municipal roadway.

PAR opening_sketch for Brighton Beach Aggregates.pdfPAR opening_sketch for Brighton Beach Aggregates.pdf

PAR opening_sketch for Nemak.pdfPAR opening_sketch for Nemak.pdf

 

Joseph Dattilo, P. Eng. Project Administrator (519) 255-6100 x6825 To be determined. Current bridge,road Current All 12/18/2017 00:00:00 12/18/2018 00:00:00
Goyeau Street (From Elliott Street to Erie Street East) 10/9/2018 10/9/2018 Tuesday, October 09, 2018

​Goyeau Street from Elliott Street to Erie Street East will have lane restrictions for manhole repairs. Flag persons will be on site. On October 9, 2018 from 8:00am to 4:00pm.

Roberta Harrison, Maintenance Coordinator (519) 255-6560 x4241 DanRuss Complete road Complete All 10/09/2018 00:00:00 10/09/2018 00:00:00
Hall Avenue (From Wyandotte Street East to Giles Boulevard) 8/14/2017 12/1/2017 Monday, August 14, 2017 to Friday, December 01, 2017

​Hall Avenue will be closed to traffic from Wyandotte Street East to Giles Boulevard for road reconstruction and watermain work.

91-17 Hall Pre-Construction Notification - OPERATIONS.pdf91-17 Hall Pre-Construction Notification - OPERATIONS.pdf

Wade Bondy 519-255-6560 Ext 4234 SLR Contracting Complete road,watermain Complete All 08/14/2017 00:00:00 12/01/2017 00:00:00
Hall Avenue (From Tecumseh Road East to Hanna Street East) Pending. Pending. Planned

Hall Avenue from Tecumseh Road to Hanna Street will be closed for paving.

Work to be completed in the Fall of 2018.

PRECISE DATE FOR WORK TO BE DETERMINED

Wade bondy, Public Works 519-255-6560 Ext 4234 Mill-Am Corporation Planned road Planned All 01/01/0001 00:00:00 01/01/0001 00:00:00
Halpin Road (From Mulberry Road to Wildwood Drive) Pending. Pending. Planned

Halpin Road from Mulberry Road to Wildwood Drive will be closed for resurfacing.

Work to be done in September / October of 2018

PRECISE DATE OF WORK TO BE DETERMINED​

Wade Bondy, Public Works 519-255-6560 Ext 4234 Coco Paving Inc. Planned road Planned All 01/01/0001 00:00:00 01/01/0001 00:00:00
Halstead Crescent (From Deerbrook Drive to Deerbrook Drive) Pending. Pending. Planned

Halstead Crescent from Deerbrook Drive to Deerbrook Drive will be closed for resurfacing.

Work to be done in September / October of 2018

PRECISE DATE OF WORK TO BE DETERMINED​

Wade Bondy, Public Works 519-255-6560 Ext 4234 Coco Paving Inc. Planned road Planned All 01/01/0001 00:00:00 01/01/0001 00:00:00
Hanna Street East (From Moy Avenue to Benjamin Avenue) Pending. Pending. Planned

Hanna Street East from Moy Avenue to Benjamin Avenue will be closed for paving.

Work to be completed in the Fall of 2018.

PRECISE DATE FOR WORK TO BE DETERMINED.

Wade bondy, Public Works 519-255-6560 Ext 4234 Mill-Am Corporation Planned road Planned All 01/01/0001 00:00:00 01/01/0001 00:00:00
Huron Church Road (From Wyandotte Street West to Girardot Street) 8/5/2018 8/12/2018 Sunday, August 05, 2018 to Sunday, August 12, 2018

Southbound Huron Church Road from Wyandotte Street West to Girardot Street will have lane restrictions for pothole patching, nightly from 7:00pm to 7:00am.

Roberta Harrison, Maintenance Coordinator 519-255-6560 Ext 4241 Alite Road Patching Complete road Complete All 08/05/2018 19:00:00 08/12/2018 00:00:00
Janisse Drive (From Wyandotte St. E. to Raymond Ave.) 7/10/2017 12/15/2017 Monday, July 10, 2017 to Friday, December 15, 2017

Janisse Drive, between Wyandotte St.E. to Raymond Ave. will be closed for sewer, watermain and road re-construction.​

Travis Frickey, (519) 255-6257x6305 To be determined. Complete sewer Complete All 07/10/2017 00:00:00 12/15/2017 00:00:00
Lake Trail Drive (From Southwood Lakes Boulevard to Southwood Lakes Boulevard) 5/28/2018 6/22/2018 Monday, May 28, 2018 to Friday, June 22, 2018

​Lake Trail Drive, from Southwood Lakes Blvd to Southwood Lakes Blvd., will experience lane restrictions for road resurfacing.

Wade Bondy, 519-255-6560 ext. 4234 To be determined. Complete road Complete All 05/28/2018 00:00:00 06/22/2018 00:00:00
Langlois Avenue (From Tecusmeh Road East to Shepherd Street) Pending. Pending. Planned

Langlois Avenue from Tecumseh Road East to Shepherd Street will be closed for paving.

Work to be completed in the Fall of 2018.

PRECISE DATE FOR WORK TO BE DETERMINED

Wade Bondy, Public Works 519-255-6560 Ext 4234 Mill-Am Corporation Planned road Planned All 01/01/0001 00:00:00 01/01/0001 00:00:00
Lauzon Parkway (From Hawthorne Drive to Cantelon Drive) 9/7/2018 9/10/2018 Friday, September 07, 2018 to Monday, September 10, 2018

​Northbound Lauzon Parkway between Hawthorne Drive and Cantelon Drive will have lane restrictions for sewer repair. From 9:00am Friday, September 7 to 9:00am Monday, September 10, 2018.

Roberta Harrison, Maintenance Coordinator (519) 255-6560 x4241 Danruss Contracting Inc. / City of Windsor Complete sewer Complete All 09/07/2018 00:00:00 09/10/2018 00:00:00
Lennon Drain Improvements, Phase 3 (Mount Carmel Drive) 7/11/2018 10/30/2018 Wednesday, July 11, 2018 to Tuesday, October 30, 2018

​The City of Windsor is proceeding with the final phase of the Lennon Drain Improvements which covers from Mount Carmel Drive to the western limit of St. Clair College.

Lennon Drain Ph 3 - commencement of construction notice.pdfLennon Drain Ph 3 - commencement of construction notice.pdf

Jane He, P. Eng., (519) 255-6100 x6358 Amico Infrastructures Inc. Current None. Current All 07/11/2018 00:00:00 10/30/2018 00:00:00
Lens Avenue (From Elsmere Avenue to Woodlawn Avenue) 9/19/2018 9/19/2018 Wednesday, September 19, 2018

Lens Avenue from Elsmere Avenue to Woodlawn Avenue will be closed for paving.

Letter to Residents - Surface Asphalt - Lens Sept 19.pdfLetter to Residents - Surface Asphalt - Lens Sept 19.pdf

Wade Bondy, Public Works 519-255-6560 Ext 4234 Coco Paving Inc. Complete road Complete All 09/19/2018 00:00:00 09/19/2018 00:00:00
Lillian Avenue (From Grand Marais Road to Vanier Street) 9/17/2018 11/2/2018 Monday, September 17, 2018 to Friday, November 02, 2018

Lillian Avenue will be closed for pavement reconstruction.

Letter to Residents - Reconstruction - Lillian.pdfLetter to Residents - Reconstruction - Lillian.pdf

Wade Bondy, Contracts Coordinator 519-255-6560 Ext 4234 SheaRock Construction Group Inc. Current road Current All 09/17/2018 00:00:00 11/02/2018 00:00:00
Lonsdale Crescent (From Deerbrook Drive to Deerbrook Drive) Pending. Pending. Planned

Lonsdale Crescent from Deerbrook Drive to Deerbrook Drive will be closed for resurfacing.

Work to be done in September / October of 2018

PRECISE DATE OF WORK TO BE DETERMINED​

Wade Bondy, Public Works 519-255-6560 Ext 4234 Coco Paving Inc. Planned road Planned All 01/01/0001 00:00:00 01/01/0001 00:00:00
Malden Road (From Chappus Street to Continental Avenue) 8/13/2018 9/10/2018 Monday, August 13, 2018 to Monday, September 10, 2018

​The Windsor Utilities Commission will be reconstructing the watermain on Malden Road from Chappus Street to Continental Avenue.

2018-022 Preconstruction Notice Malden.pdf2018-022 Preconstruction Notice Malden.pdf

Spencer Johnston, B.Sc., C.E.T. (519) 251-7300 x609 Coco Paving Complete watermain Complete All 08/13/2018 00:00:00 09/10/2018 00:00:00
Malden Road (From Continental to City of Windsor City Limits) 9/20/2018 9/24/2018 Thursday, September 20, 2018 to Monday, September 24, 2018

Northbound Malden Road from Continental to the City of Windsor limits will be closed for paving.​

Letter to Residents - Surface Asphalt - Malden.pdfLetter to Residents - Surface Asphalt - Malden.pdf

Wade Bondy: 519-255-6560 ext 4234 To be determined. Complete road Complete All 09/20/2018 00:00:00 09/24/2018 00:00:00
Marentette Avenue (From Ellis Street E. to Hanna Street E.) 6/2/2017 11/24/2017 Friday, June 02, 2017 to Friday, November 24, 2017

​Marentette Avenue between Ellis Street E. to Hanna Stree E. will be closed for sewer, watermain and road reconstruction.

 

20170531093023253.pdf20170531093023253.pdf

Travis Frickey, 519-255-6257 ext. (6305) SLR Contracting Group Complete sewer Complete All 06/02/2017 00:00:00 11/24/2017 00:00:00
Marentette Avenue (From Hanna Street to Ellis Street) Pending. Pending. Planned

Marentette Avenue from Hanna Street to Ellis Street will be closed for paving.

Work to be completed in Spring of 2019.

PRECISE DATE FOR WORK TO BE DETERMINED

Wade Bondy, Public Works 519-255-6560 Ext 4234 Mill-Am Corporation Planned road Planned All 01/01/0001 00:00:00 01/01/0001 00:00:00
Matthew Brady Boulevard (From St. Rose Avenue to Edgar Street) 5/7/2018 12/15/2018 Monday, May 07, 2018 to Saturday, December 15, 2018

​Matthew Brady Boulevard from St. Rose Avenue to Edgar Street will be restricted to local traffic for road, sewer, watermain and gas rehabilitation.

Travis Frickey, Technologist (519) 255-6257 x6305 SheaRock Construction Group Inc. Current road,sewer,watermain Current All 05/07/2018 00:00:00 12/15/2018 00:00:00
McDougall Avenue (From Erie Street East to Giles Avenue) 9/17/2018 10/3/2018 Monday, September 17, 2018 to Wednesday, October 03, 2018

​McDougall Avenue between Erie Street East and Giles Avenue will be closed for sidewalk repairs. From 9:00am to 4:00pm daily.

Roberta Harrison, Maintenance Coordinator (519) 255-6560 x4241 Giorgi Bros Construction Limited Complete sidewalk Complete All 09/17/2018 00:00:00 10/03/2018 00:00:00
McDougall Street (From Eugenie Street to CP Rail) 7/3/2018 8/3/2018 Tuesday, July 03, 2018 to Friday, August 03, 2018

​McDougall Street will be closed at the CP Rail crossing north of Eugenie Street for road construction in preparation for bike lanes and a sidewalk.

Project Notification - McDougall Rail Widening.pdfProject Notification - McDougall Rail Widening.pdf

Michael Cappucci, P. Eng. (519) 255-6257 x6355 Shearock Construction Group Inc. Complete road Complete All 07/03/2018 00:00:00 08/03/2018 00:00:00
Meadowbrook Lane (From Hawthorne Drive to Essex Way) 8/7/2018 10/12/2018 Tuesday, August 07, 2018 to Friday, October 12, 2018

​Meadowbrook Lane from Hawthorne Drive to Essex Way is closed for reconstruction.

Wade Bondy, P. Eng. Operations (519) 255-6560 x4234 Coco Paving Complete road Complete All 08/07/2018 00:00:00 10/12/2018 00:00:00
Mercer Street (From Giles Boulevard to Erie Street) Pending. Pending. Planned

Mercer Street from Giles Boulevard to Erie Street will be closed for paving.

Work to be completed in Fall of 2018

PRECISE DATE FOR WORK TO BE DETERMINED

Wade Bondy, Public Works 519-255-6560 Ext 4234 Mill-Am Corporation Planned road Planned All 01/01/0001 00:00:00 01/01/0001 00:00:00
Metcalfe Street (From Arthur Road to Pillette Road) Pending. Pending. Planned

Metcalfe Street from Arthur Road to Pillette Road will be close for paving.

Work to be completed in the Spring of 2019.

PRECISE DATE FOR WORK TO BE DETERMINED

Wade Bondy, Public Works 519-255-6560 Ext 4234 Mill-Am Corporation Planned road Planned All 01/01/0001 00:00:00 01/01/0001 00:00:00
Milloy Avenue (From Meldrum Road to Central Avenue) 9/11/2017 11/30/2017 Monday, September 11, 2017 to Thursday, November 30, 2017

​The Windsor Utilities Commission will be reconstructing the watermains on Milloy Street from Meldrum Road to Central Avenue.

110-17 Milloy Pre-Construction Notification - OPERATIONS.pdf110-17 Milloy Pre-Construction Notification - OPERATIONS.pdf

Spencer Johnston, B.Sc., C.E.T. (519) 251-7300 x609 SheaRock Construction Complete road,watermain Complete All 09/11/2017 00:00:00 11/30/2017 00:00:00
Mount Carmel Drive and Lennon Drain (From Casgrain Drive to Avon Drive) 8/24/2018 10/30/2018 Friday, August 24, 2018 to Tuesday, October 30, 2018

​Lennon Drain pedestrian path between Casgrain Drive and Avon Drive is closed for surface paving, wheelchair ramps and boulevard restoration.

Jane He, P. Eng., (519) 255-6100 x6358 Amico Infrastructures Inc. Current road Current All 08/24/2018 00:00:00 10/30/2018 00:00:00
Moy Avenue (From Shepherd Street to Tecumseh Road East) 8/8/2017 11/17/2017 Tuesday, August 08, 2017 to Friday, November 17, 2017

​Moy Avenue from Shepherd Street to Tecumseh Road East will be restricted to local traffic only for road and watermain rehabilitation.

90-17 Moy Pre-Construction Notification - OPERATIONS.pdf90-17 Moy Pre-Construction Notification - OPERATIONS.pdf

Wade Bondy, P. Eng. (519) 255-6560 x4234 or Spencer Johnston, B.Sc., C.E.T. (519) 251-7300 x609 D'Amore Construction Complete road,watermain Complete All 08/08/2017 00:00:00 11/17/2017 00:00:00
Moy Avenue (From Riverside Drive East to Wyandotte Street East) 3/5/2018 5/25/2018 Monday, March 05, 2018 to Friday, May 25, 2018

​Due to road work on Moy Avenue, Riverside Drive East will be restricted to three lanes (the curbside westbound lane will be closed). Detour signage will be in place. On Thursday, May 10, 2018.

Moy Avenue from Riverside Drive East to Wyandotte Street East and Assumption Street from Moy Avenue to Gladstone Avenue will be closed for sewer, watermain, street lighting and road rehabilitation work. Detour signage will be in place. Local traffic only.

MOY 67-17 recommencing RESIDENT NOTIFICATION LETTER.pdfMOY 67-17 recommencing RESIDENT NOTIFICATION LETTER.pdf

Janelle Coombs - Public Works - Engineering Department (519) 255-6100 x6407 Sherway Contracting Ltd. Complete road,sewer,watermain Complete All 03/05/2018 00:00:00 05/25/2018 00:00:00
North Service Road (From Conservation Drive to Turner Road) 6/4/2018 8/10/2018 Monday, June 04, 2018 to Friday, August 10, 2018

​Westbound North Service Road from Conservation Drive to Turner Road will be closed for road reconstruction.

Wade Bondy, P. Eng., (519) 255-6560 x4234 Coco Paving Complete road Complete All 06/04/2018 00:00:00 08/10/2018 00:00:00
Northwood Street (From Dandurand Avenue to South Cameron Boulevard) 7/3/2018 7/5/2018 Tuesday, July 03, 2018 to Thursday, July 05, 2018

Northwood Street will be closed from east of Dandurand Avenue to South Cameron Boulevard for resurfacing​.

Wade Bondy, 519-255-6560 Ext 4234 Coco Paving Complete road Complete All 07/03/2018 00:00:00 07/05/2018 00:00:00
Northwood Street (From Daytona Avenue to Cleary Street) 8/7/2018 9/3/2018 Tuesday, August 07, 2018 to Monday, September 03, 2018

​Northwood Street between Daytona Avenue and Cleary Street will be closed in both directions for road reconstruction.

Roberta Harrison, Maintenance Coordinator (519) 255-6560 x4241 Pierascenzi Construction Complete road Complete All 08/07/2018 00:00:00 09/03/2018 00:00:00
Olive Road (From South National Street to Seminole Street) 7/24/2017 10/31/2017 Monday, July 24, 2017 to Tuesday, October 31, 2017

​Olive Road from South National Street to Seminole Street and Seminole Street from Pillette Road to Norman Road will be closed for a reconstruction of sanitary and storm sewers as well as a new watermain. Please follow posted detour signs. Local traffic only.

OLIVE 66-17 - NOTICE TO RESIDENTS.pdfOLIVE 66-17 - NOTICE TO RESIDENTS.pdf

 

 

June Liu-Vajko, Technologist III (519) 255-6257 x6339 Major Construction (2010) Ltd. Complete sewer,road,watermain Complete All 07/24/2017 00:00:00 10/31/2017 00:00:00
Ouellette Avenue (From Wyandotte Street to Elliott Street) 2/26/2018 10/30/2018 Monday, February 26, 2018 to Tuesday, October 30, 2018

Currently, Ouellette Avenue between Wyandotte Street and Elliott Street is closed to traffic in the southbound direction, and northbound is closed between Tuscarora Street and Elliott Street.

Starting Monday, August 13, 2018 after 10:00am, southbound Ouellette Avenue between Wyandotte Street and Elliott Street will be open to traffic.

Starting Monday, August 13, 2018 after 10:00am northbound Ouellette Avenue between Wyandotte Street and Elliott Street will be closed to facilitate the ongoing streetscape improvements construction. Detour signs will be posted for non-local traffic.

Transit Windsor will continue with the current detour routes until the project is complete this fall.

In the coming weeks, the contractor will be working on the east side of Ouellette Avenue until the completion of streetscape improvements.

Pedestrian access and acces to area businesses will be available within the project boundary.​

31-17 OUELLETTE Ltr Prop Owners re commencement of construction.pdf31-17 OUELLETTE Ltr Prop Owners re commencement of construction.pdf

Jane He - 519-255-6257 x 6358 J & J Lepera Infrastructures Inc Current road,sewer Current All 02/26/2018 00:00:00 10/30/2018 00:00:00
Palms Crescent (From Deerbrook Drive to Deerbrook Drive) Pending. Pending. Planned

Palms Crescent from Deerbrook Drive to Deerbrook Drive will be closed for resurfacing.

Work to be completed in September / October of 2018.

PRECISE DATE OF WORK TO BE DETERMINED​

Wade Bondy, Public Works 519-255-6560 Ext 4234 Coco Paving Inc. Planned road Planned All 01/01/0001 00:00:00 01/01/0001 00:00:00
Peter Street (From Prince Road to South Street) Pending. Pending. Planned

Peter Street from Prince Road to South Street will be closed for paving.

Work to be completed in the Spring of 2019.

PRECISE DATE FOR WORK TO BE DETERMINED

Wade Bondy, Public Works 519-255-6560 Ext 4234 Mill-Am Corporation Planned road Planned All 01/01/0001 00:00:00 01/01/0001 00:00:00
Prince Road (From Barrymore Lane to Wells Street) 9/10/2018 9/13/2018 Monday, September 10, 2018 to Thursday, September 13, 2018

​Westbound Prince Road between Barrymore Lane and Wells Street has lane restrictions in place for sidewalk repairs. Flag persons are on site.

Roberta Harrison, Maintenance Coordinator (519) 255-6560 x4241 Giorgi Bros Construction Limited / City of Windsor Complete sidewalk Complete All 09/10/2018 00:00:00 09/13/2018 00:00:00
Princess Avenue (From Tecumseh Road East to Adstoll Avenue) 6/12/2017 11/1/2017 Monday, June 12, 2017 to Wednesday, November 01, 2017

​Princess Avenue between Tecumseh Road East and Adstoll Avenue will be closed for sewer, watermain, curb and pavement reconstruction.

03-17 PRINCESS - Resident notice letter.pdf03-17 PRINCESS - Resident notice letter.pdf

Mike Cappucci, P. Eng. (519) 255-6257 x6355 D'Amore Construction Complete sewer,curb,watermain Complete All 06/12/2017 00:00:00 11/01/2017 00:00:00
Princess Avenue (From Tecusmeh Road East to Adstoll Avenue) 9/18/2018 9/18/2018 Tuesday, September 18, 2018

Princess Avenue from Tecumseh Road East to Adstoll Avenue will be closed for paving.

Letter to Residents - Surface Asphalt - Princess.pdfLetter to Residents - Surface Asphalt - Princess.pdf

Wade Bondy, Public Works 519-255-6560 Ext 4234 Mill-Am Corporation Complete road Complete All 09/18/2018 00:00:00 09/18/2018 00:00:00
Regis Avenue (From Beachdale Road to Widlwood Drive) 9/20/2018 9/25/2018 Thursday, September 20, 2018 to Tuesday, September 25, 2018

Regis Avenue from Beachdale Drive Road to Wildwood Drive will be closed for resurfacing.

Letter to Residents - Regis.pdfLetter to Residents - Regis.pdf

Wade Bondy, Public Works 519-255-6560 Ext 4234 Coco Paving Inc. Complete road Complete All 09/20/2018 00:00:00 09/25/2018 00:00:00
Riverside Drive East (From Lauzon Road to Solidarity Towers) 6/1/2018 11/30/2018 Friday, June 01, 2018 to Friday, November 30, 2018

​Riverside Drive East, from Lauzon Road to Solidarity Towers, will be reduced to one lane (eastbound traffic only) for road, sewer and watermain rehabilitation.

Anna Godo P. Eng., 519-255-6257, ext. 6508 Amico Infrastructues Inc. Current road,sewer,watermain Current All 06/01/2018 00:00:00 11/30/2018 00:00:00
Riverside Drive East and Lauzon Road (From Dieppe Street to Solidarity Towers) 8/21/2018 12/31/2018 Tuesday, August 21, 2018 to Monday, December 31, 2018

​As part of ongoing work for the Riverside Drive Vista Project, the intersection of Riverside Drive East and Lauzon Road was re-opened on Tuesday August 21, 2018. However, the stretch from Lauzon Road east to Solidarity Tower will see intermitten lane reductions until the end of August.

The next phase of the project, beginning September 4th, will see Riverside Drive East from Dieppe Street to Solidarity Towers closed with local traffic permitted. Detour signage will be in place. That work is expected to be completed by the end of December.

Anna Godo, P. Eng. (519) 255-6100 x6508 Amico Infrastructures Inc. Current road,sewer,watermain Current All 08/21/2018 00:00:00 12/31/2018 00:00:00
Riverside Drive Vista Project, Phalse 1, Stage 2 (From Riverdale Avenue to Lauzon Road) 6/18/2018 12/31/2018 Monday, June 18, 2018 to Monday, December 31, 2018

Construction of the Riverside Drive Vista Improvement Project Phase 1 Stage 2 will result in the closure of Riverside Drive East from Lauzon Road to Riverdale Avenue. Local traffic will be permitted throughout the work but property owners are cautioned that delays are possible. Construction crews will be rebuilding the roadway with the intent of reducing driver speed and volume, while increasing safety along the scenic drive. Relocations of Hydro, Bell, Cogeco and Union Gas were undertaken in advance of the sewer, watermain and road works. Detour signage will be in place, with Wyandotte Street being the best east-west option close to Riversdie Drive.

Riverside P1 S2 Const Notice.pdfRiverside P1 S2 Const Notice.pdf

Notification Letter.pdfNotification Letter.pdf 

RIVERSIDE VISTA - objects in ROW letter 2017.pdfRIVERSIDE VISTA - objects in ROW letter 2017.pdf 

BP3.2.2  - Landscaping in the Right-Of-Way.pdfBP3.2.2 - Landscaping in the Right-Of-Way.pdf

RFT 7-18 Riverside  Ph 1 St 2 letter to residents.pdfRFT 7-18 Riverside Ph 1 St 2 letter to residents.pdf

Anna Godo, P. Eng. (519) 255-6257 Ext. 6508; Will Ceccacci, Union Gas, (519) 251-6810 Enwin Utilities, Bell, Cogeco, and Union Gas Current road Current All 06/18/2018 00:00:00 12/31/2018 00:00:00
Rossini Boulevard (From Tecumseh Road East to Griffin Court) 7/3/2018 8/31/2018 Tuesday, July 03, 2018 to Friday, August 31, 2018

​The Windsor Utilities Commission will be reconstructing the watermains on Rossini Boulevard from Tecumseh Road East to Griffin Court (Ward 5).

City Contract 06-18 Pre-Construction Notification -Rossini.pdfCity Contract 06-18 Pre-Construction Notification -Rossini.pdf

Spencer Johnston, B.Sc., C.E.T. (519) 251-7300 x609 SheaRock Construction Complete watermain Complete All 07/03/2018 00:00:00 08/31/2018 00:00:00
Rossini Boulevard (From Tecumseh Road East to Griffin Court) 9/21/2018 9/21/2018 Friday, September 21, 2018

Rossini Boulevard from Tecumseh Road to Griffin Court will be closed for paving.

Letter to Residents - Surface Asphalt - Rossini.pdfLetter to Residents - Surface Asphalt - Rossini.pdf

Wade Bondy, Publioc Works 519-255-6560 Ext 4234 SheaRock Construction Group Inc. Complete road Complete All 09/21/2018 00:00:00 09/21/2018 00:00:00
Ryerson Road (From Regis Avenue to Ashland Drive) 9/17/2018 9/19/2018 Monday, September 17, 2018 to Wednesday, September 19, 2018

Ryerson Road from Regis Avenue to Ashland Drive will be closed for resurfacing.

Letter to Residents - Ryerson.pdfLetter to Residents - Ryerson.pdf

Wade Bondy, Public Works 519-255-6560 Ext 4234 Coco Paving Inc. Complete road Complete All 09/17/2018 00:00:00 09/19/2018 00:00:00
Sandwich Street (From Prospect Avenue to John B. Avenue) 9/27/2018 9/27/2018 Thursday, September 27, 2018

​Sandwich Street from Prospect Avenue to John B. Avenue will be closed for railway track repairs. From 6:00am to 8:00pm on Thursday, September 27, 2018.

Roberta Harrison, Maintenance Coordinator (519) 255-6560 x4241 Essex Terminal Railway Complete railroad Complete All 09/27/2018 00:00:00 09/27/2018 00:00:00
Sandwich Street Roundabout (From University Avenue West to Rosedale Avenue) 6/19/2017 9/7/2018 Monday, June 19, 2017 to Friday, September 07, 2018

​The Sandwich Street roundabout will be closed until September 7, 2018 to allow for the finishing work needed on the lands surrounding the roundabout area. Detour signs will be in place.

Tiffany Pocock, P. Eng. (519) 255-6257 x6506 tpocock@citywindsor.ca or Janelle Coombs, P. Eng. (519) 255-6257 x6407 jcoombs@citywindsor.ca Major Construction (2010) Ltd. Complete road Complete All 06/19/2017 00:00:00 09/07/2018 00:00:00
Seminole Street (From George Avenue to Central Avenue) 4/23/2018 6/26/2018 Monday, April 23, 2018 to Tuesday, June 26, 2018

​Seminole Street from George Avenue to Central Avenue will be restricted to one lane for road construction. 

Coco Paving will have a full road closure on Seminole Street from Westcott Road to Chandler Road from Monday April 23, 2018 to Friday July 13, 2018.

Wade Bondy P. Eng. Contracts Coordinator (519) 255-6560 x4234 Coco Paving Complete watermain Complete All 04/23/2018 00:00:00 06/26/2018 00:00:00
Seminole Street (From Pillette Road to Norman Road) 7/24/2017 10/31/2017 Monday, July 24, 2017 to Tuesday, October 31, 2017

​Seminole Street from Pillette Road to Norman Road will be closed for sewer, road and watermain reconstruction. Posted detour signs. Local traffic only.

June Liu-Vajko (519) 255-6257 x6339 Major Construction 2010 Complete sewer,road,watermain Complete All 07/24/2017 00:00:00 10/31/2017 00:00:00
Seminole Street (From Hickory Road to Drouillard Road) 6/18/2018 10/15/2018 Monday, June 18, 2018 to Monday, October 15, 2018

​Seminole Street from Hickory Road to Drouillard Road will be reduced to one lane in each direction for watermain work.

Spencer Johnston, Supervisor, Water Construction and Design (519) 251-7300 x609 D'Amore Construction Complete watermain Complete All 06/18/2018 00:00:00 10/15/2018 00:00:00
Seminole Street (From Central Avenue to Chandler Road) 8/27/2018 10/15/2018 Monday, August 27, 2018 to Monday, October 15, 2018

​Seminole Street from Central Avenue to Chandler Road will be reduced to one lane in each direction for watermain work.

Spencer Johnston, Supervisor, Water Construction and Design (519) 251-7300 x609 To be determined. Complete watermain Complete All 08/27/2018 00:00:00 10/15/2018 00:00:00
Seminole Street and Central Avenue Intersection (From Seminole Street to Central Avenue) 4/30/2018 5/18/2018 Monday, April 30, 2018 to Friday, May 18, 2018

​The intersection of Seminole Street and Central Avenue will be closed starting April 30, 2018 for watermain and road reconstruction. Detours will be posted.

Wade Bondy, P. Eng. (519) 255-6326 Coco Paving Inc. Complete watermain,road Complete All 04/30/2018 00:00:00 05/18/2018 00:00:00
South Cameron Boulevard (From West Grand Boulevard to Howard Avenue) 9/15/2017 11/3/2017 Friday, September 15, 2017 to Friday, November 03, 2017

​South Cameron Boulevard from West Grand Boulevard to Howard Avenue will be closed for resurfacing.

Wade Bondy, P. Eng. (519) 255-6560 x4234 Coco Paving Complete road Complete All 09/15/2017 00:00:00 11/03/2017 00:00:00
South Pacific Avenue (From Jeremiah Court to Southdale Drive) 9/28/2018 10/2/2018 Friday, September 28, 2018 to Tuesday, October 02, 2018

South Pacific Avenue from Jeremiah Court to Southdale Drive will be clsoed for paving.

Letter to Residents - South Pacific Sept 27-2018.pdfLetter to Residents - South Pacific Sept 27-2018.pdf

Wade Bondy, Public Works 519-255-6560 Ext 4234 Mill-Am Corporation Complete road Complete All 09/28/2018 00:00:00 10/02/2018 00:00:00
Special Events (Details pending) 5/1/2018 12/31/2018 Tuesday, May 01, 2018 to Monday, December 31, 2018
  • Willistead Restaurant to stage the Friday Night Markets, temporary road closure on Chilver Road between Wyandotte Street East and Brant Street on Friday May 25, Friday June 29, Friday September 28 and Friday October 26, 2018.
  • Downtown Windsor Farmers Market every Saturday between May 26, 2018 and October 27, 2018 during the hours of 7:00am and 2:00pm on Pelissier Street between Park Street West and Wyandotte Street West.
  • Walkerville's Distillery District Night Market road closure on Argyle Road between Wyandotte Street East and Brant Street on Friday, September 28 and Friday, October 26, 2018, between the hours of 5:00pm and 11:00pm.
  • The Detroit Newspaper Partnership L.P. to stage the Detroit Free Press Marathon at the Vision Corridor and for a temporary road closure of Huron Church Road, Riverside Drive West, Riverside Drive East and Goyeau Street on Sunday October 21, 2018, between the hours of 7:00am and 10:00am.

 

clerks@citywindsor.ca N/A Current special event Current All 05/01/2018 00:00:00 12/31/2018 00:00:00
St John Street (From Menard Street to Dieppe Street) 10/11/2018 10/12/2018 Thursday, October 11, 2018 to Friday, October 12, 2018

St John Street and Clairview Avenue will be closed for paving.

Letter to Residents - Surface Asphalt - St John Clairview.pdfLetter to Residents - Surface Asphalt - St John Clairview.pdf

Wade Bondy, Public Works 519-255-6560 Ext 4234 Mill-Am Corporation Complete road Complete All 10/11/2018 00:00:00 10/12/2018 00:00:00
Tecumseh Road East (From Howard Avenue to Hall Avenue) 5/29/2017 11/30/2017 Monday, May 29, 2017 to Thursday, November 30, 2017

Road Rehabilitation and watermain on Tecumseh Road East from Howard Avenue to Hall Avenue.

Tecumseh East Media Release.pdfTecumseh East Media Release.pdf

Parent Closure Media Release - 1 Day Extension.pdfParent Closure Media Release - 1 Day Extension.pdf

Wade Bondy, Contracts Coordinator (519) 255-6560 x4234 SheaRock Construction Complete watermain,road Complete All 05/29/2017 00:00:00 11/30/2017 00:00:00
Tecumseh Road East (From Hall Avenue to Turner Road) 4/2/2018 7/27/2018 Monday, April 02, 2018 to Friday, July 27, 2018

​The Windsor Utilities Commission will be reconstructing the watermains on Tecumseh Road East from Hall Avenue to Turner Road.

Tecumseh Public_Notice_WUC-Road Closure.pdfTecumseh Public_Notice_WUC-Road Closure.pdf

 

 

Wade Bondy, Contracts Coordinator, Public Works 519-255-6560 Ext 4234 SheaRock Construction Complete watermain,road Complete All 04/02/2018 00:00:00 07/27/2018 00:00:00
Tecumseh Road East (From Ouellette Avenue to Windsor Avenue) 9/10/2018 9/21/2018 Monday, September 10, 2018 to Friday, September 21, 2018

​Eastbound Tecumseh Road East between Ouellette Avenue and Windsor Avenue has lane restrictions in place for sidewalk repairs.

Roberta Harrison, Maintenance Coordinator (519) 255-6560 x4241 Giorgi Bros Construction Limited / City of Windsor Complete sidewalk Complete All 09/10/2018 00:00:00 09/21/2018 00:00:00
Tecumseh Road East at Little River Bridge (From Yolanda Street to Penang Lane) 4/2/2018 8/15/2018 Monday, April 02, 2018 to Wednesday, August 15, 2018

​Tecumseh Road East will be reduced to one lane in each direction from Yolanda Street to Penang Lane for the rehabilitation of the bridge over Little River Drain. All business access will be maintained, however, left turn lanes will not be permitted through the construction zone.

Zoran Savic, Supervisor Public Works Operations (519) 255-6560 x4231 Facca Incorporated Complete bridge Complete All 04/02/2018 00:00:00 08/15/2018 00:00:00
Tecumseh Road West (From Partington Avenue to Huron Church Road) 9/4/2018 12/21/2018 Tuesday, September 04, 2018 to Friday, December 21, 2018

Tecumseh Road West from Partington Avenue to Huron Church Road will be restricted to one lane in each direction for watermain and road rehabilitation.

Pre-Construction Notification - Tec Rd West.pdfPre-Construction Notification - Tec Rd West.pdf

Wade Bondy, Public Works (519) 255-6560 x4234 D'Amore Construction (2000) Ltd. Current watermain,road Current All 09/04/2018 00:00:00 12/21/2018 00:00:00
Tranby Avenue (From Mathew Brady Blvd. to Isabelle Place) 9/14/2018 9/14/2018 Friday, September 14, 2018

​Tranby Avenue from Mathew Brady Blvd. to Isabelle Place will be closed for reconstruction.

Wade Bondy: 519-255-6560 ext. 4234 To be determined. Complete road Complete All 09/14/2018 00:00:00 09/14/2018 00:00:00
Vimy Avenue (From Walker Road to Byng Road) Pending. Pending. Planned

Vimy Avenue from Walker Road to Byng Road will be closed for paving.​

Work to be completed in the Fall of 2018.

PRECISE DATE FOR WORK TO BE DETERMINED

Wade Bondy, Public Works 519-255-6560 Ext 4234 Mill-Am Corporation Planned road Planned All 01/01/0001 00:00:00 01/01/0001 00:00:00
Ward 3 Pole Replacement (Wyandotte Street West, Bruce Avenue, Janette Avenue and Wahketa Street) 5/1/2018 6/30/2018 Tuesday, May 01, 2018 to Saturday, June 30, 2018

​Enwin Utilities Ltd. will be replacing deteriorated poles and conductor as part of a pole replacement project in the following area: Ward 3, between Wyandotte Street West, Bruce Avenue, Janette Avenue and Wahketa Street.

Bryan Draper at (519) 772-2299 x6225 Enwin Utilities Ltd. Complete None. Complete All 05/01/2018 00:00:00 06/30/2018 00:00:00
Ward 9 Pole Replacement (Provincial Road, Holburn Street, Sixth Concession Road and Locke Street) 4/1/2018 8/3/2018 Sunday, April 01, 2018 to Friday, August 03, 2018

​Enwin Utilities Ltd. will be replacing deteriorated poles and conductor as part of a pole replacement project in the following area: Ward 9, between Provincial Road, Holburn Street, Sixth Concession Road and Locke Street.

Bryan Draper at (519) 772-2299 x6225 Enwin Utilities Ltd. Complete None. Complete All 04/01/2018 00:00:00 08/03/2018 00:00:00
Wards 5 and 8 Pole Replacement (Milloy Street, Tecumseh Road East, Norman Road, Pillette Road, Arthur Avenue and Ellrose Avenue) 4/1/2018 8/3/2018 Sunday, April 01, 2018 to Friday, August 03, 2018

​​Enwin Utilities Ltd. will be replacing deteriorated poles and conductor as part of a pole replacement project in the following area: Ward 5 and 8, between Milloy Street, Tecumseh Road East, Norman Road, Pillette Road, Arthur Road and Ellrose Avenue.

Bryan Draper at (519) 772-2299 x6225 Enwin Utilities Ltd. Complete None. Complete All 04/01/2018 00:00:00 08/03/2018 00:00:00
Wards 5 and 8 Pole Replacement (South National Street, Lassaline Avenue, Ellrose Avenue and Westminster Avenue ) 4/1/2018 8/3/2018 Sunday, April 01, 2018 to Friday, August 03, 2018

​​​Enwin Utilities Ltd. will be replacing deteriorated poles and conductor as part of a pole replacement project in the following area: Wards 5 and 8, between South National Street, Lassaline Avenue, Ellrose Avenue and Westminster Avenue 

Bryan Draper at (519) 772-2299 x6225 Enwin Utilities Ltd. Complete None. Complete All 04/01/2018 00:00:00 08/03/2018 00:00:00
Wellington Avenue (From College Avenue to Tecumseh Road West) 8/13/2018 11/5/2018 Monday, August 13, 2018 to Monday, November 05, 2018

​The Windsor Utilities Commission will be reconstructing the watermain on Wellington Avenue from College Avenue to Tecumseh Road West.

2018-022 Preconstruction Notice Wellington South.pdf2018-022 Preconstruction Notice Wellington South.pdf

Spencer Johnston, B.Sc., C.E.T. (519) 251-7300 x609 Coco Paving Current watermain Current All 08/13/2018 00:00:00 11/05/2018 00:00:00
Wellington Avenue (From Wyandotte Street West to University Avenue) 8/20/2018 10/19/2018 Monday, August 20, 2018 to Friday, October 19, 2018

​The Windsor Utilities Commission will be reconstructing the watermain on Wellington Avenue from Wyandotte Street West To University Avenue.

2018-022 Preconstruction Notice Wellington North.pdf2018-022 Preconstruction Notice Wellington North.pdf

Spencer Johnston, B.Sc., C.E.T. (519) 251-7300 x609 Coco Paving Current watermain Current All 08/20/2018 00:00:00 10/19/2018 00:00:00
Windermere Road, Ontario Street, Shepherd Street (Details pending) 5/14/2018 8/31/2018 Monday, May 14, 2018 to Friday, August 31, 2018

​The Windsor Utilities Commission will be reconstructing the watermains on:

Windermere Road from Niagara Street to Shepherd Street (Ward 4)

Ontario Street from Windermere Road to Chilver Road (Ward 4)

Shepherd Street from Lincoln Road to Windermere Road (Ward 4)

2018-004 Pre-Construction Notification Windermere.pdf2018-004 Pre-Construction Notification Windermere.pdf

Matt Lockett Water Systems Designer (519) 251-7300 x639 Coco Paving Complete watermain Complete All 05/14/2018 00:00:00 08/31/2018 00:00:00
Wyandotte Street West (From Caron Avenue to Crawford Avenue) 4/30/2018 6/22/2018 Monday, April 30, 2018 to Friday, June 22, 2018

​The Windsor Utilities Commission will be reconstructing the watermains on Wyandotte Street West from Caron Avenue to Crawford Avenue (Ward 3).

WUC Contract 2018-011 Wyandotte West Notification.pdfWUC Contract 2018-011 Wyandotte West Notification.pdf

Matt Lockett Water Systems Designer (519) 251-7300 x639 D'Amore Construction Complete watermain Complete All 04/30/2018 00:00:00 06/22/2018 00:00:00

Projects Under Construction

For information on projects currently under construction, click here to launch the Construction and Detours mapping application

Projects Scheduled for Construction

For information on sewers, road widening, street lighting, City-owned facilities, and new subdivisions scheduled for construction in the near future, use the database above.  For descriptions of some maintenance activities, please consult the following pages:

Building Windsor's Future

The City of Windsor will undergo a physical transformation over the coming years due to a significant investment in capital projects. For a detailed list of current projects please visit  the Building Windsor's Future page. 

Engineering Requirements for Development in the Public Right-of-Way

For information on the City's engineering standards for construction works within the public right of way, please consult the Public Infrastructure & Right-of-Way Requirements page.

Engineering Department
350 City Hall Square West, 3rd Floor
P. O. Box 1607
Windsor, Ontario
Canada
N9A 6S1

Phone: For general information, call 311. For detailed inquires, call 519-255-6257.
Fax: 519-255-9847
Email: engineeringdept@citywindsor.ca

​​​

 

​ ​​​​​​