Construction Projects
Skip to main content Skip to navigation Skip to footer

Construction

Using the Construction and Detours Database

You can search and sort projects by several convenient methods:

  • Filter according to time, choosing from All, Current, Planned or Complete.
  • Keyword Search by street name, project type or any word that may appear in the entry.
  • By column, you can click the heading of any column to sort by that category in either ascending or descending order.​
  • By page, you can move from page to page (ten entries per page) using the buttons at the bottom.

Expand the listing to learn more by clicking the plus + symbol and close it by clicking the minus - symbol.

Street Name Start Date End Date Estimated Duration Description Contact Contractor Status Keywords Filterable Status Sortable Start Date Sortable End Date
Street Name Start Date End Date Estimated Duration Description Contact Contractor Status Keywords Filterable Status Sortable Start Date Sortable End Date
Albert Road (From Wyandotte Street East to Edna Street) 5/20/2019 6/21/2019 Monday, May 20, 2019 to Friday, June 21, 2019

Albert Road will be closed for road and watermain rehabilitation​

 

Wade Bondy, 519-255-6560 Ext 4234 Coco Paving Inc. Complete road,watermain Complete All 05/20/2019 00:00:00 06/21/2019 00:00:00
Alten Drive (From Regis Avenue to Ashland Drive) 9/18/2018 9/20/2018 Tuesday, September 18, 2018 to Thursday, September 20, 2018

​Alten Drive from Regis Avenue to Ashland Drive will be closed for resurfacing.

Letter to Residents - Alten.pdfLetter to Residents - Alten.pdf

Wade Bondy, Public Works 519-255-6560 Ext 4234 Coco Paving Inc. Complete road Complete All 09/18/2018 00:00:00 09/20/2018 00:00:00
Arthur Road (From Seminole Street to CNR tracks) 6/14/2019 6/14/2019 Friday, June 14, 2019

Arthur Road from Seminole Street to the CNR tracks wil be closed for paving.

Letter to Residents - Surface Asphalt - Arthur Metcalfe.pdfLetter to Residents - Surface Asphalt - Arthur Metcalfe.pdf

Wade bondy, Public Works 519-255-6560 Ext. 4234 Mill-Am Corporation Complete road Complete All 06/14/2019 00:00:00 06/14/2019 00:00:00
Ashland Drive (From Regis Avenue to Beachdale Road) 9/17/2018 9/18/2018 Monday, September 17, 2018 to Tuesday, September 18, 2018

Ashland Drive from Regis Avenue to Beachdale Road will be closed for resurfacing.

Letter to Residents - Ashland.pdfLetter to Residents - Ashland.pdf

Wade Bondy, Public Works 519-255-6560 Ext 4234 Coco Paving Inc. Complete road Complete All 09/17/2018 00:00:00 09/18/2018 00:00:00
Aubin Road (From Tecumseh Rd. E. to Guy St.) 4/8/2019 9/30/2019 Monday, April 08, 2019 to Monday, September 30, 2019

Installation of sewer, watermain and road reconstruction on Aubin Road from Tecumseh Rd. E. to Guy St.​

Travis Frickey, Engineering, 519-255-6100 ext 6305 D'Amore Construction (2000) Ltd. Current road,sewer,watermain Current All 04/08/2019 00:00:00 09/30/2019 00:00:00
Beachdale Road (From Esplanade Drive to Wildwood Drive) 10/11/2018 10/19/2018 Thursday, October 11, 2018 to Friday, October 19, 2018

Beachdale Road from Esplanade Drive to Wildwood Drive will be closed for resurfacing.

Work compeltion extended due to ground conditions requiring more extensive repairs.

 

Wade Bondy, Public Works 519-255-6560 Ext 4234 Coco Paving Inc. Complete road Complete All 10/11/2018 00:00:00 10/19/2018 00:00:00
Briarbank Drive (From Mulberry Road to Rosebriar Road) 5/28/2019 5/29/2019 Tuesday, May 28, 2019 to Wednesday, May 29, 2019

Briarbank Drive from Mulberry Road to Rosebriar Road will be closed for resurfacing.

Letter to Residents - Briarbank.pdfLetter to Residents - Briarbank.pdf

Letter to Residents - Surface Asphalt - Briarbank.pdfLetter to Residents - Surface Asphalt - Briarbank.pdf

Wade Bondy, Public Works 519-255-6560 Ext 4234 Coco Paving Inc. Complete road Complete All 05/28/2019 00:00:00 05/29/2019 00:00:00
Bruce Ave, Grove Ave (From see above to see above) 3/18/2019 7/26/2019 Monday, March 18, 2019 to Friday, July 26, 2019

​The Windsor Utilities Commission will be reconstructing the watermains on:

Bruce Avenue from Elliott Street to Newbury Street (Ward 3)

Bruce Avenue from Caroline Street to Grove Avenue (Ward 3)

Grove Avenue from Janette Avenue to Victoria Avenue (Ward 3)

Pre-Construction Notification Bruce and Grove.pdfPre-Construction Notification Bruce and Grove.pdf

Spencer Johnston, Supervisor Water Construction and Design (519) 251-7300 x609 Coco Paving Complete watermain Complete All 03/18/2019 00:00:00 07/26/2019 00:00:00
Bruce Ave, South Pacific Ave, Janette Ave, Charl Ave (From see above to see above) 3/18/2019 6/28/2019 Monday, March 18, 2019 to Friday, June 28, 2019

​The Windsor Utilities Commission will be reconstructing the watermains on:

Bruce Avenue from Tecumseh Road West to CPR (Ward 3)

South Pacific Avenue from Tecumseh Road West to Dougall Avenue (Ward 3)

Janette Avenue from South Pacific Avenue to North Terminal Street (Ward 3)

Charl Avenue from South Pacific Avenue to North Terminal Street (Ward 3)

Pre-Construction Letter - Janette Charl.pdfPre-Construction Letter - Janette Charl.pdf

 

Spencer Johnston, Supervisor Water Construction and Design (519) 251-7300 x609 Coco Paving Complete watermain Complete All 03/18/2019 00:00:00 06/28/2019 00:00:00
Buckingham Drive (From Rose Avenue to Iris Place) 7/9/2018 11/30/2018 Monday, July 09, 2018 to Friday, November 30, 2018

​Starting the week of July 9, 2018, in conjunction with the Windsor Utilities Commission, the City of Windsor - Office of the City Engineer - Engineering Department, will be undertaking a project to construct new sanitary and storm sewers and watermain on Buckingham Drive from Rose Avenue to Iris Place, road rehabilitation on Iris Place from Buckingham Drive to Westminster Boulevard. The sewer and watermain construction are anticipated to be completed in late 2018, if weather permits.

BUCKINGHAM 78-18 - NOTICE TO RESIDENTS.pdfBUCKINGHAM 78-18 - NOTICE TO RESIDENTS.pdf

June Liu-Vajko, Technologist III (519) 255-6257 x6339 or Norbert Poggio, P. Eng., Director of Water Engineering and Distribution at (519) 251-7300 x295 Major Construction (2010) Ltd. Complete road,sewer,watermain Complete All 07/09/2018 00:00:00 11/30/2018 00:00:00
Cabana Road (From Howard Avenue to Dougall Avenue) 5/14/2018 12/31/2019 Monday, May 14, 2018 to Tuesday, December 31, 2019

​Cabana Road east and west bound lanes from Howard Avenue to Dougall Avenue will occasionally have lane restrictions for various utility relocation work and for the construction of watermain, sewers and road.

Jane He, P. Eng. (519) 255-6100 x6358 SheaRock Construction Group Inc. Current road,sewer,watermain,sidewalk Current All 05/14/2018 00:00:00 12/31/2019 00:00:00
Cabana Road Corridor Improvements - Phase 2 (Public Information Centre) (From Howard Avenue to Dougall Avenue) 6/5/2019 6/5/2019 Wednesday, June 05, 2019

​A public Information centre (PIC) originally scheduled for May will now be held on Wednesday, June 5, 2019 to discuss Phase 2 of Cabana Road East infrastructure improvement project.

All are welcome, and area residents and business owners are especially encouraged to take advantage of the opportunity. City engineering staff, Windsor Utilities Commission (WUC) water engineering staff, project consultant RC Spencer Associates and contractor SheaRock Construction Group Inc. will all be present to discuss issues and address any concerns.

What: Cabana Road PIC

When: Wednesday, June 5, 2019 from 4:00pm to 6:00pm

Where: Roseland Public School 620 Cabana Road East

Phase 2 construction will commence the week of June 5 from west of Howard Avenue to the east of Dougall Avenue.

Jane He, P. Eng. Project Engineer (519) 255-6257 x6358 SheaRock Construction Group Inc. Complete special event Complete All 06/05/2019 00:00:00 06/05/2019 00:00:00
Campbell Avenue/College Avenue Intersection (From Campbell Avenue to College Avenue) 5/21/2019 10/31/2019 Tuesday, May 21, 2019 to Thursday, October 31, 2019

​The intersection of Campbell Avenue and College Avenue will be closed for sewer, road and watermain rehabilitation from Monday, May 27 to Friday, May 31, 2019.

Upon completion of Campbell/College intersection, sewer, road and watermain will take place at the following locations:

College from Campbell to 160m east of McKay

McKay from Adanac to 65m north of College

Curry from Adanac to Rooney

Curry McKay College -Project Notification Letter.pdfCurry McKay College -Project Notification Letter.pdf

June Liu-Vajko, Engineering (519) 255-6257 6339 Amico Infrastructures Inc. Current road,sewer,watermain,sidewalk Current All 05/21/2019 00:00:00 10/31/2019 00:00:00
College Avenue (From Wellington Avenue to Crawford Avenue) Pending. Pending. Planned

College Avenue will be closed for reconstruction.

WORK TO BE TENDERED IN FALL OF 2019​

Wade bondy, 519-255-6560 Ext 4234 TBD Planned road Planned All 01/01/0001 00:00:00 01/01/0001 00:00:00
Dolphin court (From Palms Crescent to Cul-de-sac) 5/3/2019 5/10/2019 Friday, May 03, 2019 to Friday, May 10, 2019

Dolphin Court from Palms Crescent to the cul-de-sac will be closed for resurfacing.

Notice to Residents - Palms - Dolphin.pdfNotice to Residents - Palms - Dolphin.pdf

Wade Bondy, Public Works 519-255-6560 Ext 4234 Coco Paving Inc. Complete road Complete All 05/03/2019 00:00:00 05/10/2019 00:00:00
Dominion Boulevard/Northwood Street Intersection (From Dominion Boulevard to Northwood Street) 7/15/2019 8/31/2019 Monday, July 15, 2019 to Saturday, August 31, 2019

​Watermain rehabilitation on Dominion Boulevard from E.C. Row Expressway to approximately 70m north of Municipal Building 2328. Also on Northwood Street to Longfellow to McKay.

June Liu-Vajko, Engineering (519) 255-6257 6339 SheaRock Construction Group Inc. Current watermain Current All 07/15/2019 00:00:00 08/31/2019 00:00:00
Dougall Avenue / CN Rail Underpass (From Ouellette Place to South Cameron) 8/7/2019 11/29/2019 Wednesday, August 07, 2019 to Friday, November 29, 2019

​A long term closure of the Southbound right lane on Dougall Avenue between Dougall Avenue/Ouellette Place to South Cameron Boulevard. The southbound Dougall Avenue entrance at Ouellette Place/Dougall Avenue will be closed. The left turn lane from Ouellette Place to Dougall Avenue northbound will also be closed.

Paul Mourad, P. Eng., Project Administrator (519) 255-6100 x6119 Amico Infrastructures Current road,railroad Current All 08/07/2019 00:00:00 11/29/2019 00:00:00
E.C. Row (From Dougall Ave. to Dominion Blvd.) 6/7/2019 9/30/2019 Friday, June 07, 2019 to Monday, September 30, 2019

E.C. Row from Dougall Ave. to Dominion Blvd. will be reduced to one lane in each direction; The Westbound on ramp at Dougall and the Eastbound on ramp at Dominion will be closed from 10:00 p.m. Thursday June 13th until 6:00 a.m. Friday June 14th.

Wade Bondy To be determined. Current road Current All 06/07/2019 00:00:00 09/30/2019 00:00:00
E.C. Row Expressway (Huron Church Road) 8/12/2019 9/6/2019 Monday, August 12, 2019 to Friday, September 06, 2019

​City of Windsor Parks staff will be cutting grass along the E.C. Row Expressway starting Monday, August 12, 2019. Cutting will take place on the centre median, roadside shoulders and all on-and-off ramps. Crews will begin at 7:00am on Monday at Huron Church Road and progress eastward. During morning rush hour, work will be confined to the shoulder of the road so traffic is not impeded, However, during other hours of the day, some rolling lane restrictions will be in effect. The work will last until 3:00pm each day and, depending on weather, could last up to three weeks. Motorists are asked to use extra caution and slow down when seeing workers near the roadways.

Kyle Deslippe Supervisor Parks (519) 819-4237 City of Windsor Parks Current None. Current All 08/12/2019 00:00:00 09/06/2019 00:00:00
E.C. Row Expressway Pedestrian Bridges (From Mark Avenue to Academy Drive) 5/21/2019 8/16/2019 Tuesday, May 21, 2019 to Friday, August 16, 2019

​The Mark Avenue and Academy Drive pedestrian bridges over E.C. Row Expresway will be closed for rehabilitation work. Pedestrians and cyclists are advised to use Dominion Boulevard as an alternate route during construction.

Wade Bondy, P. Eng., Contracts Coordinator (519) 255-6326 Front Construction Industries Inc. Complete bridge Complete All 05/21/2019 00:00:00 08/16/2019 00:00:00
Ellis Street (From Marentette Avenue to Elsmere Avenue) 7/8/2019 7/12/2019 Monday, July 08, 2019 to Friday, July 12, 2019

Ellis Street from Marentette Avenue to Elsmere Avenue will be closed for paving.​

 

Wade Bondy, Public Works 519-255-6560 Ext 4234 Mill-Am Corporation Complete road Complete All 07/08/2019 00:00:00 07/12/2019 00:00:00
Ellrose Avenue (From Reginald Street to VIA Rail) 6/17/2019 12/1/2019 Monday, June 17, 2019 to Sunday, December 01, 2019

​Ellrose Avenue from Reginald Street to VIA Rail and Metcalfe Street from Arthur Road to Bernard Road will be closed for sewer, watermain and road reconstruction.

Janelle Coombs, P. Eng., (519) 255-6100 x6407 Sherway Contracting (Windsor) Limited Current road,sewer,watermain,sidewalk Current All 06/17/2019 00:00:00 12/01/2019 00:00:00
Eugenie St (From Eugenie St. to McDougall St.) 9/24/2018 9/28/2018 Monday, September 24, 2018 to Friday, September 28, 2018

Eugenie St and McDougall intersection will be closed in all directions for watermain reconstruction.​

Please be advised that the 5 day full road closure on Eugenie between Ouellette and Howard, including the full closure of the McDougall intersection, will be effective the following dates:

Monday September 24th 2018 at 6:00AM through to Friday September 28th at 6:00PM.

Wade Bondy: 519-255-6560 ext 4234 Coco Paving Inc. Complete watermain,road Complete All 09/24/2018 00:00:00 09/28/2018 00:00:00
Eugenie Street East (From Ouellette Avenue to Howard Avenue) 9/24/2018 12/4/2018 Monday, September 24, 2018 to Tuesday, December 04, 2018

Eugenie Street from Oullette Avenue to Howard Avenue will be reduced to one lane in each direction for watermain construction and road resurfacing.

City Contract 45-18 Pre-Construction Notification -Eugenie.pdfCity Contract 45-18 Pre-Construction Notification -Eugenie.pdf

Wade Bondy, Public Works 519-255-6560 Ext 4234 Coco Paving Complete watermain,road Complete All 09/24/2018 00:00:00 12/04/2018 00:00:00
Everts Avenue (From Norfolk Street to Cul-de-sac) 5/23/2019 5/23/2019 Thursday, May 23, 2019

Everts Avenue from Norfolk Street to the cul-de-sac will be closed for paving

Wade Bondy, Public Works 519-255-6560 Ext 4234 Mill-Am Corporation Complete road Complete All 05/23/2019 00:00:00 05/23/2019 00:00:00
Gladstone Avenue (From Wyandotte Street East to Riverside Drive East) 9/4/2018 12/14/2018 Tuesday, September 04, 2018 to Friday, December 14, 2018

​Gladstone Avenue between Wyandotte Street East and Riverside Drive East will be closed for sewer and pavement reconstruction.

Michael Cappucci, P. Eng., (519) 255-6257 x6355 D'Amore Contracting Ltd. 2000 Complete road,sewer Complete All 09/04/2018 00:00:00 12/14/2018 00:00:00
Gladstone Avenue (From Ypres Avenue to Memorial Drive) 4/1/2019 6/7/2019 Monday, April 01, 2019 to Friday, June 07, 2019

Gladstone Avenue from Ypres Avenue to Memorial Drive will be closed for road reconstruction.​

Wade Bondy, 519-255-6560 Ext 4234 D'Amore Construction Complete road Complete All 04/01/2019 00:00:00 06/07/2019 00:00:00
Gordie Howe International Bridge Project (Details pending) 12/18/2017 12/18/2018 Monday, December 18, 2017 to Tuesday, December 18, 2018

As the preparatory activities progress on the Gordie Howe International Bridge project, and the completion of the first phase of the  perimeter access road (PAR), the WDBA has introduced a new detour route (Monday December 18, 2017) for access to some businesses. The PAR remains closed to non-local traffic. Duration of Detour is unknown at this time, however if required, a one year place holder may be used at this time. 

A map illustrating the new access route is attached for your reference.  

This four kilometre road will circle the Canadian Port of Entry (POE) and provide access into the POE for employees, visitors and suppliers. It will also replace existing roadways that local businesses use to access facilities. Once construction of the Gordie Howe International Bridge project is complete, the City of Windsor will assume ownership of the PAR and will be responsible for maintaining the road as a municipal roadway.

PAR opening_sketch for Brighton Beach Aggregates.pdfPAR opening_sketch for Brighton Beach Aggregates.pdf

PAR opening_sketch for Nemak.pdfPAR opening_sketch for Nemak.pdf

 

Joseph Dattilo, P. Eng. Project Administrator (519) 255-6100 x6825 To be determined. Complete bridge,road Complete All 12/18/2017 00:00:00 12/18/2018 00:00:00
Grand Marais Road West (From Dougall Avenue to Dominion Boulevard) Pending. Pending. Planned

Grand Marais Road West will be closed for reconstruction.

WORK TO BE TENDERED IN THE FALL OF 2019​

Wade Bondy, 519-255-6560 Ext 4234 TBD Planned road Planned All 01/01/0001 00:00:00 01/01/0001 00:00:00
Hall Avenue (From Tecumseh Road East to Hanna Street East) Pending. Pending. Planned

Hall Avenue from Tecumseh Road to Hanna Street will be closed for paving.

Work to be completed in the Fall of 2019.

PRECISE DATE FOR WORK TO BE DETERMINED

Wade bondy, Public Works 519-255-6560 Ext 4234 Mill-Am Corporation Planned road Planned All 01/01/0001 00:00:00 01/01/0001 00:00:00
Halpin Road (From Mulberry Road to Wildwood Drive) 11/6/2018 11/8/2018 Tuesday, November 06, 2018 to Thursday, November 08, 2018

Halpin Road from Mulberry Road to Wildwood Drive will be closed for resurfacing.

Letter to Residents - Halpin.pdfLetter to Residents - Halpin.pdf

Wade Bondy, Public Works 519-255-6560 Ext 4234 Coco Paving Inc. Complete road Complete All 11/06/2018 00:00:00 11/08/2018 00:00:00
Halstead Crescent (From Deerbrook Drive to Deerbrook Drive) 5/7/2019 5/10/2019 Tuesday, May 07, 2019 to Friday, May 10, 2019

Halstead Crescent from Deerbrook Drive to Deerbrook Drive will be closed for resurfacing.

Wade Bondy, Public Works 519-255-6560 Ext 4234 Coco Paving Inc. Complete road Complete All 05/07/2019 00:00:00 05/10/2019 00:00:00
Hanna Street East (From Moy Avenue to Benjamin Avenue) 6/10/2019 6/12/2019 Monday, June 10, 2019 to Wednesday, June 12, 2019

Hanna Street East from Moy Avenue to Benjamin Avenue will be closed for paving.

 

Wade bondy, Public Works 519-255-6560 Ext 4234 Mill-Am Corporation Complete road Complete All 06/10/2019 00:00:00 06/12/2019 00:00:00
Huron Church Road (From Wyandotte Street West to Girardot Street) 8/5/2018 8/12/2018 Sunday, August 05, 2018 to Sunday, August 12, 2018

Southbound Huron Church Road from Wyandotte Street West to Girardot Street will have lane restrictions for pothole patching, nightly from 7:00pm to 7:00am.

Roberta Harrison, Maintenance Coordinator 519-255-6560 Ext 4241 Alite Road Patching Complete road Complete All 08/05/2018 19:00:00 08/12/2018 00:00:00
Huron Church Road (From Malden Road to Dorchester Road) 4/1/2019 7/12/2019 Monday, April 01, 2019 to Friday, July 12, 2019

Huron church Road from Malden Road to Dorchester Road will be reduced to one lane in each direction for reconstruction.​

Please click "here" for more details.

Zoran Savic, Contracts Supervisor Coco Paving Inc. Complete road,watermain Complete All 04/01/2019 00:00:00 07/12/2019 00:00:00
Langlois Avenue (From Tecusmeh Road East to Shepherd Street) 6/3/2019 6/7/2019 Monday, June 03, 2019 to Friday, June 07, 2019

Langlois Avenue from Tecumseh Road East to Shepherd Street will be closed for paving.

 

Wade Bondy, Public Works 519-255-6560 Ext 4234 Mill-Am Corporation Complete road Complete All 06/03/2019 00:00:00 06/07/2019 00:00:00
Lauzon Line and McHugh Street Intersection (Details pending) 7/29/2019 9/20/2019 Monday, July 29, 2019 to Friday, September 20, 2019

Alternating lane closures will take place at the Lauzon Line/McHugh Street/Lauzon Road intersection for approximately one and a half months to allow for intersection improvements. Access through the intersection will remain open during construction.

 

Fahd Mikhael, P.Eng, City of Windsor (519) 255 6100 x6734 Pierascenzi Construction Limited Current road Current All 07/29/2019 00:00:00 09/20/2019 00:00:00
Lens Avenue (From Elsmere Avenue to Woodlawn Avenue) 9/19/2018 9/19/2018 Wednesday, September 19, 2018

Lens Avenue from Elsmere Avenue to Woodlawn Avenue will be closed for paving.

Letter to Residents - Surface Asphalt - Lens Sept 19.pdfLetter to Residents - Surface Asphalt - Lens Sept 19.pdf

Wade Bondy, Public Works 519-255-6560 Ext 4234 Coco Paving Inc. Complete road Complete All 09/19/2018 00:00:00 09/19/2018 00:00:00
Lillian Avenue (From Grand Marais Road to Vanier Street) 9/17/2018 12/14/2018 Monday, September 17, 2018 to Friday, December 14, 2018

Lillian Avenue will be closed for pavement reconstruction.

Letter to Residents - Reconstruction - Lillian.pdfLetter to Residents - Reconstruction - Lillian.pdf

Wade Bondy, Contracts Coordinator 519-255-6560 Ext 4234 SheaRock Construction Group Inc. Complete road Complete All 09/17/2018 00:00:00 12/14/2018 00:00:00
Lonsdale Crescent (From Deerbrook Drive to Deerbrook Drive) 5/28/2019 5/29/2019 Tuesday, May 28, 2019 to Wednesday, May 29, 2019

Lonsdale Crescent from Deerbrook Drive to Deerbrook Drive will be closed for resurfacing.

Letter to Residents - Surface Asphalt - Lonsdale.pdfLetter to Residents - Surface Asphalt - Lonsdale.pdf

Wade Bondy, Public Works 519-255-6560 Ext 4234 Coco Paving Inc. Complete road Complete All 05/28/2019 00:00:00 05/29/2019 00:00:00
Louis Avenue (From Erie Street to Cataraqui Street) Pending. Pending. Planned

Louis Avenue will be closed for road and watermain construction​.

WORK TO BE TENDERED IN 2019

Wade Bondy, 519-255-6560 Ext 4234 TBD Planned road,watermain Planned All 01/01/0001 00:00:00 01/01/0001 00:00:00
Malden Road (From Continental to City of Windsor City Limits) 9/20/2018 9/24/2018 Thursday, September 20, 2018 to Monday, September 24, 2018

Northbound Malden Road from Continental to the City of Windsor limits will be closed for paving.​

Letter to Residents - Surface Asphalt - Malden.pdfLetter to Residents - Surface Asphalt - Malden.pdf

Wade Bondy: 519-255-6560 ext 4234 To be determined. Complete road Complete All 09/20/2018 00:00:00 09/24/2018 00:00:00
Marentette Avenue (From Hanna Street to Ellis Street) 6/28/2019 7/2/2019 Friday, June 28, 2019 to Tuesday, July 02, 2019

Marentette Avenue from Hanna Street to Ellis Street will be closed for paving.

Letter to Residents - Surface Asphalt - Marentette Ellis.pdfLetter to Residents - Surface Asphalt - Marentette Ellis.pdf

Wade Bondy, Public Works 519-255-6560 Ext 4234 Mill-Am Corporation Complete road Complete All 06/28/2019 00:00:00 07/02/2019 00:00:00
Matthew Brady Boulevard (From Edgar Street to Tranby Avenue) 7/2/2019 11/30/2019 Tuesday, July 02, 2019 to Saturday, November 30, 2019

​Matthew Brady Boulevard from Edgar Street to Tranby Avenue will be closed for sewer, watermain, street lighting and road reconstruction.

Michael Cappucci, P. Eng. (519) 255-6100 x6355 D'Amore Construction (2000) Ltd. Current sewer,road,watermain Current All 07/02/2019 00:00:00 11/30/2019 00:00:00
Mercer Street (From Giles Boulevard to Erie Street) 5/13/2019 5/15/2019 Monday, May 13, 2019 to Wednesday, May 15, 2019

Mercer Street from Giles Boulevard to Erie Street will be closed for paving.

 

Wade Bondy, Public Works 519-255-6560 Ext 4234 Mill-Am Corporation Complete road Complete All 05/13/2019 00:00:00 05/15/2019 00:00:00
Metcalfe Street (From Arthur Road to Pillette Road) Pending. Pending. Planned

Metcalfe Street from Arthur Road to Pillette Road will be close for paving.

Work delayed due to Pillette Road construction. 

Wade Bondy, Public Works 519-255-6560 Ext 4234 TBD Planned road Planned All 01/01/0001 00:00:00 01/01/0001 00:00:00
Mulford Court (From Brock Street to Prince Road) 7/2/2019 8/9/2019 Tuesday, July 02, 2019 to Friday, August 09, 2019

​The Windsor Utilities Commission will be reconstructing the watermains on Mulford Court from Brock Street to Prince Road (Ward 2).

2019-023 Mulford Pre-Construction Letter.pdf2019-023 Mulford Pre-Construction Letter.pdf

Spencer Johnston, Supervisor Water Construction and Design (519) 251-7300 x609 Coco Paving Complete watermain Complete All 07/02/2019 00:00:00 08/09/2019 00:00:00
Ninth Concession Road (From Baseline Road to South of Baseline Road) 8/6/2019 9/13/2019 Tuesday, August 06, 2019 to Friday, September 13, 2019

Ninth Concession Road will be closed for reconstruction.

Letter to Residents - Reconstruction 9th.pdfLetter to Residents - Reconstruction 9th.pdf

Wade Bondy, 519-255-6560 Ext 4234 Major Construction 2010 Ltd. Current road Current All 08/06/2019 00:00:00 09/13/2019 00:00:00
Ojibway Parkway (From Sprucewood Avenue to Morton Drive) 8/7/2019 8/9/2019 Wednesday, August 07, 2019 to Friday, August 09, 2019

​Northbound Ojibway Parkway will have a lane reduction between Sprucewood Avenue and Morton Drive for ditch maintenance. From 8:00am to 6:00pm, Wednesday, August 7 to Friday, August 9, 2019.

Roberta Harrison, Maintenance Coordinator, (519) 255-6560 x4241 Belmont Complete None. Complete All 08/07/2019 00:00:00 08/09/2019 00:00:00
Ojibway Parkway (From Sprucewood Avenue to Morton Drive) 8/13/2019 8/15/2019 Tuesday, August 13, 2019 to Thursday, August 15, 2019

​Northbound Ojibway Parkway continues to be reduced to one lane between Sprucewood Avenue and Morton Drive for road repair. 8:00am to 6:00pm, ongoing until August 15, 2019.

Roberta Harrison, Maintenance Coordinator (519) 255-6560 x4241 DiPonti Paving Complete road Complete All 08/13/2019 00:00:00 08/15/2019 00:00:00
Olive Road (From Seminole Street to Milloy Street) 6/24/2019 10/31/2019 Monday, June 24, 2019 to Thursday, October 31, 2019

​Olive Road from Seminole Street to Milloy Street will be closed for sewer, watermain and road reconstruction. Reginald Street to Norman Road will be closed for road reconstruction.

June Liu-Vajko Technologist III (519) 255-6257 x6339 Sterling Ridge Infrastructure Inc. Current road,sewer,watermain Current All 06/24/2019 00:00:00 10/31/2019 00:00:00
Ouellette Avenue (Erie Street) 8/20/2019 8/24/2019 Tuesday, August 20, 2019 to Saturday, August 24, 2019

​Northbound Ouellette Avenue will be reduced to one lane at Erie Street for sewer repair. On Tuesday, August 20 to Saturday, August 24, 2019.

Roberta Harrison, Maintenance Coordinator (519) 255-6560 x4241 DanRuss Current sewer Current All 08/20/2019 00:00:00 08/24/2019 00:00:00
Palms Crescent (From Deerbrook Drive to Deerbrook Drive) 5/3/2019 5/10/2019 Friday, May 03, 2019 to Friday, May 10, 2019

Palms Crescent from Deerbrook Drive to Deerbrook Drive will be closed for resurfacing.

 

Wade Bondy, Public Works 519-255-6560 Ext 4234 Coco Paving Inc. Complete road Complete All 05/03/2019 00:00:00 05/10/2019 00:00:00
Park Street West (From Pelisser Street to Caron Avenue) 8/6/2019 10/18/2019 Tuesday, August 06, 2019 to Friday, October 18, 2019

Park Street West will be closed for road and watermain reconstruction​.

City Contract 09-19 Park Street - Construction Notice.pdfCity Contract 09-19 Park Street - Construction Notice.pdf

Wade Bondy, 519-255-6560 Ext 4234 Major Construction Current road,watermain Current All 08/06/2019 00:00:00 10/18/2019 00:00:00
Partington Avenue (From Wyandotte Street West to College Avenue) 5/21/2019 7/26/2019 Tuesday, May 21, 2019 to Friday, July 26, 2019

​The Windsor Utilities Commission (WUC) will be installing a new 200mm dia. PVC watermain on Partington Avenue from Wyandotte Street West to College Avenue. The project should take approximately 4 weeks to complete. Project timing is weather dependant.

2019-011 Partington Pre-Construction Letter.pdf2019-011 Partington Pre-Construction Letter.pdf

Spencer Johnston, Supervisor Water Construction and Design (519) 251-7300 x609 D'Amore Construction 2000 Ltd. Complete watermain Complete All 05/21/2019 00:00:00 07/26/2019 00:00:00
Peter Street (From Prince Road to South Street) 5/27/2019 5/30/2019 Monday, May 27, 2019 to Thursday, May 30, 2019

Peter Street from Prince Road to South Street will be closed for paving.

Letter to Residents - Surface Asphalt - Peter Watkins.pdfLetter to Residents - Surface Asphalt - Peter Watkins.pdf

Wade Bondy, Public Works 519-255-6560 Ext 4234 Mill-Am Corporation Complete road Complete All 05/27/2019 00:00:00 05/30/2019 00:00:00
Pierre Ave, Tuscarora St, Cataraqui St (From see above to see above) 3/18/2019 7/5/2019 Monday, March 18, 2019 to Friday, July 05, 2019

​The Windsor Utilities Commission will be reconstructing the watermains on:

Pierre Avenue from Wyandotte Street East to Shepherd Street (Ward 4)

Tuscarora Street from Pierre Avenue to Alley west of Marion Avenue (Ward 4)

Cataraqui Street from Pierre Avenue to Marion Avenue (Ward 4)

Pre-Construction Letter Pierre.pdfPre-Construction Letter Pierre.pdf

Spencer Johnston, Supervisor Water Construction and Design (519) 251-7300 x609 Coco Paving Complete watermain Complete All 03/18/2019 00:00:00 07/05/2019 00:00:00
Pillette Road (From Seminole Street to South National) 7/22/2019 10/31/2019 Monday, July 22, 2019 to Thursday, October 31, 2019

​Pillette Road will be closed between Seminole and South National Street for approximately two and a half months for Sewer, Watermain, Streetlighting and Road Reconstruction. Local traffic only.

Sergio Colucci, Eng. II, City of Windsor (519) 255 6100 x 6336 Amico Infrastructures Current road,sewer,watermain Current All 07/22/2019 00:00:00 10/31/2019 00:00:00
Princess Avenue (From Tecusmeh Road East to Adstoll Avenue) 9/18/2018 9/18/2018 Tuesday, September 18, 2018

Princess Avenue from Tecumseh Road East to Adstoll Avenue will be closed for paving.

Letter to Residents - Surface Asphalt - Princess.pdfLetter to Residents - Surface Asphalt - Princess.pdf

Wade Bondy, Public Works 519-255-6560 Ext 4234 Mill-Am Corporation Complete road Complete All 09/18/2018 00:00:00 09/18/2018 00:00:00
Provincial Road (From Cabana Road to Walker Road) 4/23/2019 8/23/2019 Tuesday, April 23, 2019 to Friday, August 23, 2019

​Enbridge Gas (formerly Union Gas) will do the gasmain relocation on Provincial Road from South of Cabana Road to Walker Road.

Jane He, P. Eng., City of Windsor (519) 255-6257 x6358, Will Ceccacci - Enbridge Gas (519) 564-7909 or Steve Drouin - Aecon (226) 787-3163 Enbridge Gas and Aecon Current None. Current All 04/23/2019 00:00:00 08/23/2019 00:00:00
Regis Avenue (From Beachdale Road to Widlwood Drive) 9/20/2018 9/25/2018 Thursday, September 20, 2018 to Tuesday, September 25, 2018

Regis Avenue from Beachdale Drive Road to Wildwood Drive will be closed for resurfacing.

Letter to Residents - Regis.pdfLetter to Residents - Regis.pdf

Wade Bondy, Public Works 519-255-6560 Ext 4234 Coco Paving Inc. Complete road Complete All 09/20/2018 00:00:00 09/25/2018 00:00:00
Riverside Dr. E. (University Ave. E., Chatham St. E., McDougall St.) 3/22/2019 5/20/2019 Friday, March 22, 2019 to Monday, May 20, 2019

​Streetlight replacement on Riverside Dr. E., University Ave. E., Chatham St. E., and Mcdougall St. near City Hall and Caesars Windsor Casino.

Tiffany Pocock, Engineering - 519-255-6100 ext. 6506 Dundas Powerline Inc. Complete None. Complete All 03/22/2019 00:00:00 05/20/2019 00:00:00
Riverside Drive Vista Project, Phase 1, Stage 2 (From Riverdale Avenue to Lauzon Road) 6/18/2018 8/16/2019 Monday, June 18, 2018 to Friday, August 16, 2019

Riverside Drive East between Lauzon Road and Riverdale Avenue will have lane restriction and be restricted to local traffic for Watermain, Sewer, Road Reconstruction. Detour signs will be posted. Contractor resumes construction activities on March 25, 2019.

Riverside P1 S2 Const Notice.pdfRiverside P1 S2 Const Notice.pdf

Notification Letter.pdfNotification Letter.pdf 

RIVERSIDE VISTA - objects in ROW letter 2017.pdfRIVERSIDE VISTA - objects in ROW letter 2017.pdf 

BP3.2.2  - Landscaping in the Right-Of-Way.pdfBP3.2.2 - Landscaping in the Right-Of-Way.pdf

RFT 7-18 Riverside  Ph 1 St 2 letter to residents.pdfRFT 7-18 Riverside Ph 1 St 2 letter to residents.pdf

Anna Godo, P. Eng. (519) 255-6257 Ext. 6508; Will Ceccacci, Union Gas, (519) 251-6810 Enwin Utilities, Bell, Cogeco, and Union Gas Complete road Complete All 06/18/2018 00:00:00 08/16/2019 00:00:00
Rossini Boulevard (From Tecumseh Road East to Griffin Court) 9/21/2018 9/21/2018 Friday, September 21, 2018

Rossini Boulevard from Tecumseh Road to Griffin Court will be closed for paving.

Letter to Residents - Surface Asphalt - Rossini.pdfLetter to Residents - Surface Asphalt - Rossini.pdf

Wade Bondy, Publioc Works 519-255-6560 Ext 4234 SheaRock Construction Group Inc. Complete road Complete All 09/21/2018 00:00:00 09/21/2018 00:00:00
Ryerson Road (From Regis Avenue to Ashland Drive) 9/17/2018 9/19/2018 Monday, September 17, 2018 to Wednesday, September 19, 2018

Ryerson Road from Regis Avenue to Ashland Drive will be closed for resurfacing.

Letter to Residents - Ryerson.pdfLetter to Residents - Ryerson.pdf

Wade Bondy, Public Works 519-255-6560 Ext 4234 Coco Paving Inc. Complete road Complete All 09/17/2018 00:00:00 09/19/2018 00:00:00
South Pacific Ave (Details pending) 3/22/2019 6/14/2019 Friday, March 22, 2019 to Friday, June 14, 2019

Windsor Utilities Commission (WUC) installation of new watermains:

 

South Pacific Ave. - Tecumseh Rd. W. to Dougall Ave.

​Janette Ave - South Pacific Ave. to North Terminal

​Charl St - South Pacific Ave. to North Terminal

Bruce Ave - Tecumseh Rd W. to C.P. Rail

Spencer Johnston, Supervisor WUC, 519-251-7300 ext. 609 Coco Paving Complete watermain Complete All 03/22/2019 00:00:00 06/14/2019 00:00:00
Special Events (From N/A to N/A) 4/23/2019 1/4/2020 Tuesday, April 23, 2019 to Saturday, January 04, 2020

Essex Pride Fest to stage Pride Fest on Friday, August 9 to Sunday, August 11, 2019 at Lanspeary Park and the Lions Outdoor Rink.

Downtown Windsor Community Collaborative to temporarily close Pelissier Street between Park Street West and Wyandotte Street West to host the regular Downtown Windsor Farmers Market every Saturday between May 25, 2019 and October 26, 2019 between the hours of 7:00am and 2:00pm.

Walkerville's Distillery District Night Market road closure on Argyle Road between Wyandotte Street East and Brant Street on Friday, May 31, 2019, Friday, June 28, 2019, Friday, July 26, 2019, and Friday, August 30, 2019. Time of event 5:00pm - 11:00pm.

The Roman Catholic Episcopal Corporation of the Diocese of London in Ontario to stage St. Angela Merici Community Festival and a temporary road closure of Erie Street East between Howard Avenue and Parent Avenue on Saturday, August 10 to Sunday August 11, 2019.

Forks and Barrels LTD. to host the Forks and Barrels Fest at Riverfront Festival Plaza on Friday, August 23, 2019 to Sunday, August 25, 2019.

The Ontario Cycling Association Incorporated to stage the 2019 Via Italia International Bike Race from 9:00am to 9:00pm on Sunday, September 1, 2019 and for a temporary road closure of Erie Street East between Howard Avenue and Parent Avenue (the traffic circle located at the intersection of Erie Street East and Parent Avenue for north, south and east bound traffic will remain open throughout the event), Parent Avenue between Erie Street East and Giles Boulevard East, Giles Boulevard East between Parent Avenue and Howard Avenue, and Howard Avenue between Giles Boulevard East and Erie Street East.

The Olde Riverside Town Centre Business Association to host Wheels on Wyandotte Antique Car and Motorcycle Show on Saturday, September 7, 2019 from 1:00pm to 4:00pm and for a temporary road closure of Wyandotte Street East between Thompson Boulevard and Jefferson Boulevard.

1890940 Ontario Inc. to stage the Coming Home Music Fest at Riverfront Festival Plaza and Riverfront Civic Terrace on Saturday, September 14, 2019.

Poutine Feast Ontario Inc. to stage the Poutine Feast at Riverfront Festival Plaza and Riverfront Civic Terrace on Thursday, Ocotober 10, 2019 to Sunday, October 13, 2019.

Office of the City Clerk Council Services (519) 255-6211 N/A Current special event Current All 04/23/2019 00:00:00 01/04/2020 00:00:00
St John Street (From Menard Street to Dieppe Street) 10/11/2018 10/12/2018 Thursday, October 11, 2018 to Friday, October 12, 2018

St John Street and Clairview Avenue will be closed for paving.

Letter to Residents - Surface Asphalt - St John Clairview.pdfLetter to Residents - Surface Asphalt - St John Clairview.pdf

Wade Bondy, Public Works 519-255-6560 Ext 4234 Mill-Am Corporation Complete road Complete All 10/11/2018 00:00:00 10/12/2018 00:00:00
St. Luke Road (From Seminole Street to ETR) 6/10/2019 9/13/2019 Monday, June 10, 2019 to Friday, September 13, 2019

​The Windsor Utilities Commission will be reconstructing the watermains on: St. Luke Road from Seminole Street to ETR (Ward 5).

10-19 St Luke Construction Notification.pdf10-19 St Luke Construction Notification.pdf

Spencer Johnston, Supervisor Water Construction and Design (519) 251-7300 x609 D'Amore Construction Current watermain Current All 06/10/2019 00:00:00 09/13/2019 00:00:00
Tecumseh Road West (From Partington Avenue to Huron Church Road) 9/4/2018 8/9/2019 Tuesday, September 04, 2018 to Friday, August 09, 2019

Tecumseh Road West from Partington Avenue to Huron Church Road will be restricted to one lane in each direction for watermain and road rehabilitation.

Pre-Construction Notification - Tec Rd West.pdfPre-Construction Notification - Tec Rd West.pdf

Work will start again on Monday July 15, 2019.   Eastbound will be reduced to one lane.

Wade Bondy, Public Works (519) 255-6560 x4234 D'Amore Construction (2000) Ltd. Complete watermain,road Complete All 09/04/2018 00:00:00 08/09/2019 00:00:00
Totten Street (From South Cameron Blvd to Hillcrest Blvd) 4/1/2019 6/30/2019 Monday, April 01, 2019 to Sunday, June 30, 2019

​New bike lanes are being constructed on Totten Street from South Cameron Blvd. to Hillcrest Blvd.

Josette M. Eugeni, Manager of Transportation Planning Rudak Excavating Inc. Complete road Complete All 04/01/2019 00:00:00 06/30/2019 00:00:00
Totten Street (From South Cameron Boulevard to Hillcrest Boulevard) 4/1/2019 6/30/2019 Monday, April 01, 2019 to Sunday, June 30, 2019

The City of Windsor will begin installing buffered bike lanes on Totten Street between South Cameron Boulevard and Hillcrest Boulevard on April 1, 2019.
 
The contractor for the project expects the work to last until June, but once complete, it will provide a valuable connection between the recently constructed buffered bike lanes on South Cameron Boulevard and the bike lanes on Prince Road, as well as the trail that passes through the South Cameron Woodlot via Randolph Avenue. The painted buffer provides additional separation and comfort between the people on bikes and in vehicles.
 
Property owners along the route will play an important role in this project.  Work done that has any impact on private properties will be repaired to its pre-construction state.  The City asks that residents keep collection days in mind during construction and follow the instructions on the Project Notification Letter to help ensure no containers go missing.
 
Drivers travelling through or within the construction zone are reminded to do their part to make sure everyone goes home safely: reduce your speed, follow the signage and respect the flag persons when present.
 
This bike lane project will include widening the existing pavement to add a buffered bike lane in each direction. Roadside drainage has also been taken into consideration and incorporated into the design.

 

For more information on cycling in Windsor visit www.cyclewindsor.ca. or call 311 . 
Josette Eugeni, Manager of Transportation Planning (519) 255-6247 x6418 City of Windsor Complete road Complete All 04/01/2019 00:00:00 06/30/2019 00:00:00
Tranby Avenue (From Mathew Brady Blvd. to Isabelle Place) 9/14/2018 6/14/2019 Friday, September 14, 2018 to Friday, June 14, 2019

​Tranby Avenue from Mathew Brady Blvd. to Isabelle Place will be closed for reconstruction.

Wade Bondy: 519-255-6560 ext. 4234 To be determined. Complete road Complete All 09/14/2018 00:00:00 06/14/2019 00:00:00
Vimy Avenue (From Walker Road to Byng Road) 10/29/2018 10/30/2018 Monday, October 29, 2018 to Tuesday, October 30, 2018

Vimy Avenue from Walker Road to Byng Road will be closed for paving.​

Wade Bondy, Public Works 519-255-6560 Ext 4234 Mill-Am Corporation Complete road Complete All 10/29/2018 00:00:00 10/30/2018 00:00:00
Walker Road (From Tecumseh Road East to Ypres Avenue) 7/16/2019 7/20/2019 Tuesday, July 16, 2019 to Saturday, July 20, 2019

​Southbound Walker Road will be reduced to one lane between Tecumseh Road East and Ypres Avenue for road repairs. From 7:00am Tuesday, July 16 to 7:00pm Saturday, July 20, 2019.

Roberta Harrison, Maintenance Coordinator (519) 255-6560 x4241 Pierascenzi Construction Complete road Complete All 07/16/2019 00:00:00 07/20/2019 00:00:00
Windermere Road (From Tecumseh Road East to Ypres Avenue) 6/10/2019 8/23/2019 Monday, June 10, 2019 to Friday, August 23, 2019

​The Windsor Utilities Commission will be reconstructing the watermains on: Winderemere Road from Tecumseh Road East to Ypres Avenue (Ward 5)

08-19 Windermere Construction Notification.pdf08-19 Windermere Construction Notification.pdf

Spencer Johnston, Supervisor Water Construction and Design (519) 251-7300 x609 Major Construction Current watermain Current All 06/10/2019 00:00:00 08/23/2019 00:00:00
Wyandotte Street East (From Janisse Drive to St Rose Avenue) Pending. Pending. Planned

Wyandotte Street East will be closed for rehabilitation.

WORK TO BE TENDERED IN 2019​

Wade Bondy, 519-255-6560 Ext 4234 TBD Planned road Planned All 01/01/0001 00:00:00 01/01/0001 00:00:00
Ypres Avenue (From Forest Avenue to Marentette Avenue) 5/14/2019 7/31/2019 Tuesday, May 14, 2019 to Wednesday, July 31, 2019

Ypres Avenue will be closed for resurfacing.​

Pavement repairs will re-commence July 9.

Letter to Residents - Mill and Pave - Ypres.pdfLetter to Residents - Mill and Pave - Ypres.pdf

Letter to Residents - Ypres Curb repairs.pdfLetter to Residents - Ypres Curb repairs.pdf

Wade Bondy, 519-255-6560 Ext 4234 MillAm Complete road Complete All 05/14/2019 00:00:00 07/31/2019 00:00:00
Ypres Avenue (From Chilver Road to Lincoln Road) 7/5/2019 7:00 AM 7/5/2019 12:00 PM Friday, July 05, 2019, from 07:00 AM to 12:00 PM

The intersection of Ypres Avenue and Windermere Road will be closed to traffic from 7:00am to noon for watermain construction.   ​

Wade Bondy, Contracts Coordinator 519-255-6560 Ext4234 Major Construction Complete watermain Complete All 07/05/2019 07:00:00 07/05/2019 12:00:00

Projects Under Construction

For information on projects currently under construction, click here to launch the Construction and Detours mapping application

Projects Scheduled for Construction

For information on sewers, road widening, street lighting, City-owned facilities, and new subdivisions scheduled for construction in the near future, use the database above.  For descriptions of some maintenance activities, please consult the following pages:

Building Windsor's Future

The City of Windsor will undergo a physical transformation over the coming years due to a significant investment in capital projects. For a detailed list of current projects please visit  the Building Windsor's Future page. 

Engineering Requirements for Development in the Public Right-of-Way

For information on the City's engineering standards for construction works within the public right of way, please consult the Public Infrastructure & Right-of-Way Requirements page.

Engineering Department
350 City Hall Square West, 3rd Floor
P. O. Box 1607
Windsor, Ontario
Canada
N9A 6S1

Phone: For general information, call 311. For detailed inquires, call 519-255-6257.
Fax: 519-255-9847
Email: engineeringdept@citywindsor.ca

​​​

 

​ ​​​​​​