Litter River in sunlightThe City of Windsor in conjunction with the Essex Region Conservation Authority (ERCA) and the Town of Tecumseh initiated a Class Environmental Assessment Study in accordance with Phase 1 & 2 of the Municipal Class Environmental Assessment (EA) process. The purpose of the study is to document existing conditions and to recommend storm water management measures to protect existing resources as development continues in the upper reaches of Little River.

Project Updates

Master Plan Process Update

In October 2017, the master plan was completed and filed. Due to the overall duration of the project and changes to the EA requirements, the approach to completing the master plan has changed. No changes have been made to the alternatives considered or master plan recommendations. Further details can be found a the link below:

Environmental Assessment Report Completed

The City of Windsor has completed the Class Environmental Assessment for Upper Little River, and the report is being tabled for the 30-day review period. You can access the report, appendices, and the Notice of Completion at the links below: 

Public Information Centre #2 - October 22, 2012

Public Information Centre #1 - May 29, 2012

Trouble opening the documents?

Note: Documents are best viewed in Adobe Reader X (10) or higher. If you are having trouble viewing the documents in Adobe Reader, please use "Save As" for the link and you can open the downloaded file from your computer.

For general information, call 311. For detailed inquiries, contact: 

Anna M. Godo, P. Eng.
Engineer III/Drainage Superintendent
City of Windsor
350 City Hall Square West
Windsor, Ontario, N9A 6S1
Canada
Phone: (519) 255-6100 ext. 6508