Construction and Detours - A Streets
A
| Location: |
Aubin Road |
|
Project Type: |
Storm, Sanitary, Watermain and Road Reconstruction |
| Closures / Detours |
Aubin Road from Franklin Street to CN Rail |
| Start Date: |
September 7, 2010 |
| Estimated Completion Date: |
November, 2010 |
| Updates: |
|
| Contacts: |
City of Windsor, Sergio Colucci, P. Eng. (519) 255-6257
x6336
scolucci@city.windsor.on.ca |
| Contractor: |
D'Amore Construction |
Construction and Detours - B Streets
B
There are no road currently being worked on.
Construction an Detours - C Streets
C
| Location: |
Central Avenue Bridge at E. C. Row Expressway |
|
Project Type: |
Bridge Rehabilitation |
| Closures / Detours |
Central Bridge over E. C. Row Expressway will have lane restrictions |
| Start Date: |
August 17, 2010 |
| Estimated Completion Date: |
November 2010 |
| Updates: |
|
| Contacts: |
City of Windsor, Mark Winterton, P. Eng. Contracts Manager,
(519) 255-6560 x4233
mwinterton@city.windsor.on.ca |
| Contractor: |
|
|
Location: |
County Road 42 |
|
Project Type: |
Trunk Sanitary Sewer Installation along County Road 42 from 8th Concession Road to Little River
|
|
Closures / Detours |
n/a
|
|
Start Date: |
March 1, 2010 |
|
Estimated Completion Date: |
September 2010 |
|
Updates: |
|
|
Contacts: |
City of Windsor, Sergio Colucci, P. Eng., (519) 255-6257 x6336
scolucci@city.windsor.on.ca
|
|
Contractor: |
Amico Infrastructures Inc. |
Construction and Detours - D Streets
D
| Location: |
Dawson Road |
|
Project Type: |
Road Pavement, Sewer and Watermain Reconstruction |
| Closures / Detours |
Dawson Road from Wyandotte Street East to the CNR Tracks |
| Start Date: |
August 16, 2010 |
| Estimated Completion Date: |
October 29, 2010 |
| Updates: |
Wyandotte Street East will be reduced to two lanes periodically for work to be performed in the intersection. |
| Contacts: |
City of Windsor, Stacey Shyshak, EIT (519) 255-6257
x6462
sshyshak@city.windsor.on.ca |
| Contractor: |
Amico Infrastructure |
| Location: |
Dougall Avenue |
|
Project Type: |
Concrete Pavement Panel Repairs |
| Closures / Detours |
Dougall Avenue between Liberty Street and West Grand Boulevard |
| Start Date: |
July 5, 2010 |
| Estimated Completion Date: |
August 27, 2010 |
| Updates: |
|
| Contacts: |
City of Windsor, Mark Winterton, P. Eng. Contracts Manager,
(519) 255-6560 x4233
mwinterton@city.windsor.on.ca |
| Contractor: |
Pierascenzi Construction Ltd. |
Construction and Detours - E Streets
E
| Location: |
Eastcourt Drive |
|
Project Type: |
Repaving |
| Closures / Detours |
Eastcourt Drive from Forest Glade Drive to Suffolk Street |
| Start Date: |
August 13, 2010 |
| Estimated Completion Date: |
September 10, 2010 |
| Updates: |
|
| Contacts: |
City of Windsor, Larry Webb, Contract Coordinator, (519)
255-6560 x4234 lwebb@city.windsor.on.ca |
| Contractor: |
|
| Location: |
Eastlawn Avenue |
|
Project Type: |
Road, Sewer and Watermain Reconstruction |
| Closures / Detours |
Eastlawn Avenue from Edgar Street to Cul De Sac |
| Start Date: |
July 12, 2010 |
| Estimated Completion Date: |
August 27, 2010 |
| Updates: |
|
| Contacts: |
City of Windsor, Travis Frickey, Technologist (519) 255-6257
x6305
tfrickey@city.windsor.on.ca |
| Contractor: |
Amico Infrastructures Inc.
|
Construction and Detours - F Streets
F
| Location: |
Forest Avenue |
|
Project Type: |
Road and Watermain Reconstruction |
| Closures / Detours |
Forest Avenue between Tecumseh Road East and Ypres Avenue |
| Start Date: |
July 5, 2010 |
| Estimated Completion Date: |
September 24, 2010 |
| Updates: |
|
| Contacts: |
Windsor Utilities Commission, Spencer Johnston, (519)
251-7300 x609 sjohnston@wuc.on.ca
City of Windsor, Larry Webb, Contract Coordinator, (519)
255-6560 x4234 lwebb@city.windsor.on.ca |
| Contractor: |
Coco Paving Inc. |
| Location: |
Forest Glade Drive |
|
Project Type: |
Milling and Paving |
| Closures / Detours |
Forest Glade Drive from Tecumseh Road to Lauzon Road |
| Start Date: |
August 24, 2010 |
| Estimated Completion Date: |
September 14, 2010 |
| Updates: |
|
| Contacts: |
City of Windsor, Mark Winterton, P. Eng. Contracts Manager,
(519) 255-6560 x4233
mwinterton@city.windsor.on.ca |
| Contractor: |
|
Construction and Detours - G Streets
| Location: |
Gail Road |
|
Project Type: |
Trunk Storm Sewer and Pavement Reconstruction |
| Closures / Detours |
Gail Road from Somme Avenue to Head Avenue
and westerly to alley |
| Start Date: |
August 16, 2010 |
| Estimated Completion Date: |
October 31, 2010 |
| Updates: |
|
| Contacts: |
City of Windsor, Andrew Dowie P. Eng. (519)
255-6257 ext 6734
adowie@city.windsor.on.ca |
| Contractor: |
D'Amore Construction |
| Location: |
Grand Marais Road |
|
Project Type: |
Milling and Paving |
| Closures / Detours |
Grand Marais Road from Dominion to Glenwood and Dominion Boulevard from Grand Marais to West Grand |
| Start Date: |
August 16, 2010 |
| Estimated Completion Date: |
September 3, 2010 |
| Updates: |
|
| Contacts: |
City of Windsor, Mark Winterton, P. Eng. Contracts Manager,
(519) 255-6560 x4233
mwinterton@city.windsor.on.ca |
| Contractor: |
|
H
Construction and Detours - H Streets
|
Location: |
Highway 401 |
|
Project Type: |
Road Reconstruction and Widening |
|
Closures / Detours |
Highway 401 - Highway 3 to east of County Road 19 |
|
Start Date: |
September 24, 2007 |
|
Estimated Completion Date: |
2010 |
|
Updates: |
Highway 401 - eastbound off ramp at County Road 46 will be closed from mid August, 2010 to mid November, 2010.
|
|
Contacts: |
Ministry of Transportation, Steve Killaire, P. Eng. (519)
873-4725
|
|
Contractor: |
Coco Paving Inc. |
| Location: |
Howard Avenue |
|
Project Type: |
Grade Separation |
| Closures / Detours |
n/a
|
| Start Date: |
July 13, 2009 |
| Estimated Completion Date: |
2011 |
| Updates: |
|
| Contacts: |
Ontario Ministry of Transportation, Brian Kope, P.
Eng., (519) 873-4794 Brian.Kope@ontario.ca
|
| Contractor: |
Coco Paving Inc. |
| Location: |
Howard Avenue |
|
Project Type: |
Removal and Replacement of Concrete Panels |
| Closures / Detours |
Howard Avenue between Grand Marais Road and Eugenie Street |
| Start Date: |
August 12, 2010 |
| Estimated Completion Date: |
September 3, 2010 |
| Updates: |
|
| Contacts: |
City of Windsor, Mark Winterton, P. Eng. Contracts Manager,
(519) 255-6560 x4233
mwinterton@city.windsor.on.ca |
| Contractor: |
|
Construction and Detours - I Streets
I
There are no streets currently being worked on.
Construction and Detours - J Streets
J
There are currently no roads being worked on.
Construction and Detours - K Streets
K
There are currently no roads being worked on.
Construction and Detours - L Streets
L
| Location: |
Lauzon Parkway at E. C. Row Expressway |
|
Project Type: |
Bridge Rehabilitation |
| Closures / Detours |
Lauzon Parkway Bridge over E. C. Row expressway |
| Start Date: |
June 30, 2010 |
| Estimated Completion Date: |
November 10, 2010 |
| Updates: |
|
| Contacts: |
City of Windsor, Mark Winterton, P. Eng. Contracts Manager,
(519) 255-6560 x4233
mwinterton@city.windsor.on.ca |
| Contractor: |
Amico Contracting |
| Location: |
Lauzon Road |
|
Project Type: |
Road Construction - Repaving |
| Closures / Detours |
Lauzon Road from Tecumseh Raod East to Forest Glade Drive |
| Start Date: |
August 9, 2010 |
| Estimated Completion Date: |
September 3, 2010 |
| Updates: |
Lauzon Road from Yolanda Street to Vince Street will have lane restrictions for repaving on August 9, 2010 to September 3, 2010 |
| Contacts: |
City of Windsor, Larry Webb, Contract Coordinator, (519)
255-6560 x4234 lwebb@city.windsor.on.ca |
| Contractor: |
|
| Location: |
Longfellow Avenue, Alexandra Avenue, Academy Drive,
Dandurand Avenue, Virginia Park Avenue |
|
Project Type: |
Curb and Gutter and Asphalt Pavement |
| Closures / Detours |
Construction will take place from Northwood to E. C. Row Service Road |
| Start Date: |
June 21, 2010 |
| Estimated Completion Date: |
August 27, 2010 |
| Updates: |
|
| Contacts: |
City of Windsor, Larry Webb, Contract Coordinator, (519)
255-6560 x4234 lwebb@city.windsor.on.ca |
| Contractor: |
|
M
Construction and Detours - M Streets
| Location: |
McDougall Street |
|
Project Type: |
Watermain Construction |
| Closures / Detours |
McDougall Street from Erie Street East to Giles Blvd |
| Start Date: |
August 30, 2010 |
| Estimated Completion Date: |
October 31, 2010 |
| Updates: |
|
| Contacts: |
Windsor Utilities Commission, Spencer Johnston, (519)
251-7300 x609 sjohnston@wuc.on.ca
City of Windsor, Larry Webb, Contract Coordinator, (519)
255-6560 x4234 lwebb@city.windsor.on.ca |
| Contractor: |
|
| Location: |
Memorial Drive at Howard Avenue Intersection |
|
Project Type: |
Grade Separation |
| Closures / Detours |
Memorial Drive will be closed to traffic from Lillian Avenue to Howard Avenue
|
| Start Date: |
August 3, 2010 |
| Estimated Completion Date: |
November 26, 2010 |
| Updates: |
|
| Contacts: |
Ontario Ministry of Transportation, Brian Kope, P. Eng.,
(519) 873-4794
brian.kope@ontario.ca |
| Contractor: |
Coco Paving Inc. |
| Location: |
Mercer Street |
|
Project Type: |
Watermain Reconstruction |
| Closures / Detours |
Mercer Street from Elliot Street to Erie Street |
| Start Date: |
April 19, 2010 |
| Estimated Completion Date: |
End of September, 2010 |
| Updates: |
|
| Contacts: |
Windsor Utilities Commission, Spencer Johnston, (519)
251-7300 x609 sjohnston@wuc.on.ca
City of Windsor, Larry Webb, Contract Coordinator, (519)
255-6560 x4234 lwebb@city.windsor.on.ca |
| Contractor: |
D'Amore Construction |
Construction and Detours - N Streets
N
There are currently no streets being worked on.
Construction and Detours - O Streets
O
There are currently no roads being worked on.
Construction and Detours - P Streets
P
| Location: |
Parent Avenue |
|
Project Type: |
Trunk Storm Sewer Construction, Sanitary Sewer,
Road and Watermain Reconstruction
|
| Closures / Detours |
Parent Avenue from Elsmere/Terminal to Ypres |
| Start Date: |
June 2, 2010 |
| Estimated Completion Date: |
September 15, 2010 |
| Updates: |
|
| Contacts: |
Windsor Utilities Commission, Spencer Johnston, (519)
251-7300 x609 sjohnston@wuc.on.ca
City of Windsor, Andrew Dowie, P. Eng., (519) 255-6257
x6734
adowie@city.windsor.on.ca |
| Contractor: |
Coco Paving Inc. |
|
Location: |
Pelissier Street |
|
Project Type: |
City Centre streetscape Project Phase 4 & 5 - ISF Project (utilities, watermain
and streetscape work)
|
|
Closures / Detours |
Pelissier Street from University to Wyandotte and Maiden Lane West |
|
Start Date: |
March 29, 2010 |
|
Estimated Completion Date: |
November 2010 |
|
Updates: |
University Avenue will be closed between Ouellette Avenue and Victoria Avenue. Local traffic only will be permitted on University Avenue between Victoria Avenue and Pelissier
Street as well as between Ouellette Avenue and Pelissier Street. No traffic will be permitted to cross Pelissier Street on University Avenue. Pelissier Street will remain open to a single lane of traffic. Starting Monday, August 30, 2010 until September 17, 2010.
|
|
Contacts: |
City of Windsor, Wadah Al-Yassiri, P. Eng., CET, (519) 255-6100 x6494
walyassiri@city.windsor.on.ca
|
|
Contractor: |
SLR Contracting Group Inc. |
Construction and Detours - Q Streets
Q
There are currently no roads being worked on.
Construction an Detours - R Streets
R
| Location: |
Raymond Avenue |
|
Project Type: |
Road, Sewer and Watermain Reconstruction |
| Closures / Detours |
Raymond Avenue from Westminster Boulevard to Jefferson Boulevard
|
| Start Date: |
June 25, 2010 |
| Estimated Completion Date: |
October 8, 2010 |
| Updates: |
|
| Contacts: |
City of Windsor, June Liu-Vajko, Technologist (519) 255-6257
x6339
jliuvajko@city.windsor.on.ca |
| Contractor: |
M.R. Dunn Contractors Inc. |
| Location: |
Riverfront |
|
Project Type: |
Retention and Treatment Basin
|
| Closures / Detours |
Westbound curb lane of Riverside Driver between Glengarry Avenue and Aylmer
Avenue, and Battagello Riverwalk and multi-use trail will be closed from Glengarry to
to Parent until March 2011. The area will be subject to construction traffic
throughout this time. An alternative pedestrian route is being marked on Riverside Drive.
|
| Start Date: |
January 8, 2010
|
| Estimated Completion Date: |
March 31, 2011 |
| Updates: |
|
| Contacts: |
City of Windsor, Jake Renaud, P. Eng. (519) 255-6257
x6825 jrenaud@city.windsor.on.ca
|
| Contractor: |
Sherway Contracting (Windsor) Limited |
| Location: |
Riverside Drive East |
|
Project Type: |
Road Resurfacing |
| Closures / Detours |
Riverside Drive East from Clover to easterly City of
Windsor limits
|
| Start Date: |
July 28, 2010 |
| Estimated Completion Date: |
September 15, 2010 |
| Updates: |
|
| Contacts: |
City of Windsor, Mark Winterton, P. Eng. Contracts Manager,
(519) 255-6560 x4233
mwinterton@city.windsor.on.ca |
| Contractor: |
Coco Paving |
| Location: |
Rose Ville Garden |
|
Project Type: |
Concrete Operations at Intersection |
| Closures / Detours |
Rose Ville Garden Drive and Tecumseh Road East |
| Start Date: |
August 16, 2010 |
| Estimated Completion Date: |
September 3, 2010 |
| Updates: |
|
| Contacts: |
City of Windsor, Jane He, P. Eng. (519)
255-6257 x6358 jhe@city.windsor.on.ca |
| Contractor: |
Coco Paving Inc. |
Construction and Detours - S Streets
S
| Location: |
Somme Avenue |
|
Project Type: |
Trunk Storm Sewer and Pavement Reconstruction |
| Closures / Detours |
Somme Avenue from Kildare westerly to Alley
|
| Start Date: |
August 16, 2010 |
| Estimated Completion Date: |
October 31, 2010 |
| Updates: |
|
| Contacts: |
City of Windsor, Andrew Dowie, P. Eng. (519) 255-6257 x6734
adowie@city.windsor.on.ca
|
| Contractor: |
D'Amore Construction |
| Location: |
Spring Garden Road |
|
Project Type: |
Watermain Reconstruction |
| Closures / Detours |
Spring Garden Road from Malden Road Easterly to Municipal 2250 Spring Garden
|
| Start Date: |
September 7, 2010 |
| Estimated Completion Date: |
November, 2010 |
| Updates: |
|
| Contacts: |
Windsor Utilities Commission, Spencer Johnston, (519)
251-7300 x609 sjohnston@wuc.on.ca
|
| Contractor: |
SLR Contracting |
| Location: |
Sunset Avenue |
|
Project Type: |
Road Rehabilitation |
| Closures / Detours |
Sunset Avenue between University Street West and Wyandotte Street West
|
| Start Date: |
May 25, 2010 |
| Estimated Completion Date: |
August 31, 2010 |
| Updates: |
|
| Contacts: |
City of Windsor, Paul Mourad, P. Eng. (519) 255-6257 x6119
pmourad@city.windsor.on.ca |
| Contractor: |
Aecom |
Construction and Detours - T Streets
T
|
Location: |
Tecumseh Road East |
|
Project Type: |
Sanitary Sewer Extension, Watermain Reconstruction and 6 lane Concrete
Road Reconstruction. This project is being funded as part of the Infrastructure Stimulus Fund Program.
|
|
Closures / Detours |
Tecumseh Road East from Jefferson Boulevard to Lauzon Parkway
|
|
Start Date: |
April 5, 2010 |
|
Estimated Completion Date: |
November 26, 2010 |
|
Updates: |
|
|
Contacts: |
City of Windsor, Fahd Mikhael, P. Eng., (519) 255-6257 x6890
fmikhael@city.windsor.on.ca
|
|
Contractor: |
Coco Paving Inc. |
| Location: |
Tecumseh Road East |
|
Project Type: |
Asphalt Paving |
| Closures / Detours |
Tecumseh Road East will have lane restriction from Goyeau Street to Highland Avenue
|
| Start Date: |
July 21, 2010 |
| Estimated Completion Date: |
End of August, 2010 |
| Updates: |
|
| Contacts: |
City of Windsor, Mark Winterton, P. Eng. Contracts Manager,
(519) 255-6560 x4233
mwinterton@city.windsor.on.ca |
| Contractor: |
|
Construction and Detours - U Streets
U
There are currently no roads being worked on.
Construction and Detours - V Streets
V
There are currently no roads being worked on.
Construction and Detours - W Streets
W
| Location: |
Walker Road |
|
Project Type: |
Road Reconstruction |
| Closures / Detours |
Walker Road from Legacy Park Drive to Highway 401
|
| Start Date: |
March 8, 2010 |
| Estimated Completion Date: |
November 2010 |
| Updates: |
7th Concession Road and Provincial Road will be closed at Walker
Road from Monday, August 23 until Friday, September 10.
Walker Road will remain reduced to single lane traffic
in both directions.
Continuing: All Businesses remain open and are accessible
via Legacy Park Drive to Provincial Road. Cyclists and pedestrians will not be allowed access
in this work zone during the closure.
Walker Road will remain reduced to single lane of traffic in both directions.
|
| Contacts: |
City of Windsor, Anna M. Godo, P.Eng. (519) 255-6257 x6508 agodo@city.windsor.on.ca
|
| Contractor: |
Coco Paving (1990) inc. |
| Location: |
Walker Road / Wyandotte Street Intersection improvements |
|
Project Type: |
Road Construction and Intersection Improvements |
| Closures / Detours |
Wyandotte Street East between Walker Road and
Monmouth Street and on Tuscarora Street from Walker Road to Monmouth Road.
|
| Start Date: |
Monday March 22, 2010 |
| Estimated Completion Date: |
September 8, 2010 |
| Updates: |
Wyandotte Street East from Walker Road to St. Luke Road is closed to All traffic
starting July 14,2010, will remain closed in next 6-8 weeks.
Walker Road is open to all traffic. Wyandotte Street East is open to all traffic from Walker Road
westerly. Wyandotte places are opened to all traffic.
|
| Contacts: |
City of Windsor, Jane He, P. Eng. (519)
255-6257 x6358 jhe@city.windsor.on.ca |
| Contractor: |
J & J Lepera Infrastructures Inc. |
| Location: |
Westcott Road |
|
Project Type: |
Road, Sewer and Watermain Reconstruction |
| Closures / Detours |
Westcott Road from CNR to Metcalfe Street. |
| Start Date: |
April, 2010 |
| Estimated Completion Date: |
September, 2010 |
| Updates: |
|
| Contacts: |
City of Windsor, Fahd Mikhael, P. Eng., (519) 255-6257 x6890
fmikhael@city.windsor.on.ca
|
| Contractor: |
J & J Lepera Infrastructures Inc. |
| Location: |
Whitney Avenue |
|
Project Type: |
Road and Watermain Reconstruction |
| Closures / Detours |
Whitney Avenue from Prince Road to Chappell Avenue
|
| Start Date: |
July 12, 2010 |
| Estimated Completion Date: |
September 10, 2010 |
| Updates: |
|
| Contacts: |
Windsor Utilities Commission, Spencer Johnston, (519)
251-7300 x609 sjohnston@wuc.on.ca
City of Windsor, Larry Webb, Contract Coordinator, (519)
255-6560 x4234 lwebb@city.windsor.on.ca |
| Contractor: |
SLR Contracting |
| Location: |
Wyandotte Street East |
|
Project Type: |
Road and Sewer Construction |
| Closures / Detours |
Wyandotte Street East between Florence Avenue and Bellagio Drive
|
| Start Date: |
September 14, 2009 |
| Estimated Completion Date: |
December 10, 2010 |
| Updates: |
|
| Contacts: |
City of Windsor, Jane He, P. Eng. 255-6257 x6358 jhe@city.windsor.on.ca
|
| Contractor: |
Amico Infrastructures Inc. |
| Location: |
Wyandotte Street East |
|
Project Type: |
Pavement, Sewer, and Watermain Reconstruction |
| Closures / Detours |
Wyandotte Street East will be reduced to two
lanes from Pillette to Raymo
|
| Start Date: |
Monday morning, August 23, 2010 |
| Estimated Completion Date: |
Tuesday evening August 24, 2010 |
| Updates: |
This closure is in connection with the
Dawson Road pavement, sewer and watermain reconstruction
|
| Contacts: |
City of Windsor, Stacey Shyshak, EIT (519) 255-6257
x6462
sshyshak@city.windsor.on.ca |
| Contractor: |
Amico Infrastructure |
| Location: |
Wyandotte Street West |
|
Project Type: |
Sunset Avenue Sewer Rehabilitation Program |
| Closures / Detours |
Patricia Road to California Avenue |
| Start Date: |
August 3, 2010 |
| Estimated Completion Date: |
September 3, 2010 |
| Updates: |
|
| Contacts: |
City of Windsor, Paul Mourad, P. Eng. (519) 255-6257 x6119
pmourad@city.windsor.on.ca |
| Contractor: |
Aecom |
Construction and Detours - X Streets
X
There are no streets currently being worked on.
Construction and Detours - Y Streets
Y
There are no streets currently being worked on.
Construction and Detours - Z Streets
Z
There are no streets currently being worked on.
|